CAPITAL HILL PU D <br />TRAFFIC SAFETY AND <br />STREET CONNECTIVITY STUDY <br />Eugene, Oregon <br />BEI Project 74-020 <br />Prepared for: <br />Carol Schirmer <br />Schirmer Satre Group <br />375 W. 4t" Ave, Suite 201 <br />Eugene, OR 97401 <br />Prepared by: <br />D PROFFs~i <br />#6278OPE <br />OREGON <br />4 L/ Y 13 20~~ <br />9~~FN G 1~~~~ <br />EXPIRES: JUNE 30, 2017 <br />-Br_anc <br />Ho"GINEERING.. <br />Since 1977 <br />civil • transportation <br />structural • geotechnical <br />S U R V E Y I N G <br />www.BranchEngineering.com <br />(Revised) May 1 7, 201 7 <br />310 Sth Street <br />Springfield, OR 97477 <br />p: 541.746.0637 <br />f: 541.746.0389 <br />