Capital Hill PUD: PDT 17-01 <br />Completeness Review Response <br />Page 7 of 9 <br />improvements to Capital Drive. It appears the Geotechnical/Geological Investigation does not <br />address this issue, nor does the written narrative address this. There may be other similar issues <br />immediately adjacent to the subject site, and if so they will need to be addressed to be consistent <br />with the South Hills Study. The written narrative should also address the highlights of the <br />Geotechnical/Geological investigation. <br />See attached Geotechnical/Geologic Investigation and Geotechnical Investigation Addendum. <br />See Private Roadway Plan & Profile Sheets C3 and C4 to show grading impacts. There are none <br />to Cresta De Ruta. <br />PUBLIC WORKS <br />Storm Drainage Requirements <br />14. Application proposes construction of public streets; provide stormwater treatment plan for public <br />streets based on infiltration, filtration or mechanical priority and include sizing calculations that <br />demonstrate whether treatment of runoff from adjoining lots will be on-site or in public infiltration <br />facility in right of way. <br />15. Application proposes construction of private street(s) and/or shared driveway(s); provide stormwater <br />treatment plan for private street(s) and shared driveway(s) based on infiltration and filtration priority <br />and include sizing calculations that demonstrate whether treatment of runoff from adjoining lots will be <br />on-site or in private shared facility. <br />16. Application (CUP/SR/PUD) includes impervious surface area to be constructed with a future <br />development permit; provide stormwater treatment plan and analysis for runoff from impervious <br />surface area based on infiltration, filtration or payment priority. <br />• Please address the hierarchy of infiltration vs. filtration vs. mechanical treatment. Applicant <br />addresses reason for not using infiltration but not filtration. Only one copy submitted. <br />See statements in section 3.1 in the revised Stormwater Managements Plan and Drainage Study, <br />updated June 19, 2017. <br />Street and Public Accessway Requirements <br />27. Show street names for all existing and proposed streets (public and private) and identify the street <br />classification. <br />• Show street name for proposed private street. <br />The street has been named Cupola Avenue. <br />28. Identify potential slope easements. <br />• Potential grading shown, but please identify as slope easement. <br />See slope easements on Site Plan. <br />29. Show location and widths (tight of way and paving width) of all existing and proposed streets, <br />intersections, and bike and pedestrian access ways, both within the plat and adjacent to the plat. <br />• Show right of way width of existing portion of Capital Drive to remain. <br />Right of way width is shown on Site Plan. The right of way widens out in front of Lot 23 (the <br />existing house) in order that the improvements to Capital Drive can be placed on the uphill (cut) <br />side of the existing road and not affect existing driveways, front walks, front steps on the downhill <br />side. <br />This will all be made clearer at time of PEPI submittal. <br />Fire Department Comments and Conditions <br />1. Fire Department Access - 2014 Eugene Fire Code Reference 503.1 and more specifically 503.2.1 <br />Fire Department Access Road Dimension <br />a. Capital Hill PUD Developed Roads "Capital Drive" - referenced from the SW corner of Lot #21 to <br />the NW corner of Lot #1 (Plan Set Sheet Reference 6.0) <br />Schirmer Satre Group • 375 West 4 m Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 <br />