My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SUPPLEMENTAL MATERIALS (6-19-17)
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
SUPPLEMENTAL MATERIALS (6-19-17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 4:08:45 PM
Creation date
6/21/2017 10:38:28 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Supplemental Materials
Document_Date
6/19/2017
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Hill PUD, Tentative (14-020) <br />June 19, 2017 <br />water will essentially flow into the ground and along the top layer of gravel as it does today. For <br />that reason, no additional detention or flow control was designed for this discharge location. <br />For additional information on the facility details, or the HydroCAD analysis, please see Appendices <br />A&C. <br />4.0 CONCLUSION <br />The stormwater system for the Capital Hill PUD has been designed in accordance with the City of <br />Eugene Stormwater Management Manual for Water Quality & Flow Control requirements. <br />Branch Engineering, Inc. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.