Capital Hill PUD, Tentative (14-020) <br />June 19, 2017 <br />water will essentially flow into the ground and along the top layer of gravel as it does today. For <br />that reason, no additional detention or flow control was designed for this discharge location. <br />For additional information on the facility details, or the HydroCAD analysis, please see Appendices <br />A&C. <br />4.0 CONCLUSION <br />The stormwater system for the Capital Hill PUD has been designed in accordance with the City of <br />Eugene Stormwater Management Manual for Water Quality & Flow Control requirements. <br />Branch Engineering, Inc. <br />6 <br />