(8) WELL TEST <br />❑ Pump ❑ Bailer Air ❑ Flowing Artesian <br />Permeability Yield GPM 10 <br />Conductivity PH <br />Temperature of water 57 °F/C Depth artesian flow found ft. <br />Was a water analysis done? ❑ Yes No <br />By whom <br />Depth of strata analyzed. From <br />Remarks: <br />ft. to ft. <br />0-C, <br />V!!~b-irq <br />Date Started 9-1-05 Completed 9-1-05 <br />PROFESSIONAL CERTIFICATION <br />(to be signed by a licensed water supply or monitoring well constructor, or Oregon <br />registered geologist or civil engineer.) <br />I accept responsibility for the construction, alteration, or abandonment work <br />performed during the construction dates reported above. All work performed <br />during this time is in compliance with Oregon's geotechnical hole construction <br />standards. This re rt i true to the best of my knowledge and belief <br />ice r gistration Number 1553 <br />Signed jj)jljp~ Date g- <br />Afliation <br />C- <br />T S REPORT ST RE SUBMITTED TO THE WATER RESOURCES DEPARTMENT WITHIN 30 DAYS OF COMPLETION OF WORK <br />Date Started 9-1-05 Completed 9-1-95 <br />(I2) ABANDONMENT LOG <br />Material Description From Tu. Sacks or Pounds <br />