My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board of Commissioners Meeting Materials (6/13/17) (3)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
Board of Commissioners Meeting Materials (6/13/17) (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 1:48:01 PM
Creation date
6/19/2017 10:10:12 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB ADOPTION PACKAGE
Document Type
Staff Report
Document_Date
6/13/2017
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the size criterion, it is worthy of consideration in conjunction with lower priority land, and is <br />reconsidered in that context below. <br />(2) Conclusion for Second Priority Land within the River Road/Santa Clara <br />Community Park Expansion Study Area <br />After dismissing candidate land without appropriate site characteristics, 18.9 acres of second priority <br />land has the potential to meet the required site characteristics for the park expansion if and only if it is <br />considered in conjunction with school land currently within the urban growth boundary and additional, <br />adjacent lower priority land. If adjacent fourth priority land meets the needed site characteristics for a <br />community park, such an aggregated site would allow the City to expand on some of this higher priority <br />land, minimizing expansion on lower priority land. <br />e. Third Priority Land - Apply State's Factors for Dismissal of <br />Candidate Land <br />There is no land designated as marginal land within the study area. Therefore, there is no third <br />priority land to consider for the proposed park expansion. <br />f. Fourth Priority Land - Apply State's Factors for Dismissal of <br />Candidate Land <br />The park expansion study area includes <br />1,930.1 acres of fourth priority land, shown <br />on the Fourth Priority Land within Study <br />Area map below. All fourth priority land in <br />the study area is designated Agriculture. <br />The determination of the City's need for an <br />additional community park site to serve the <br />River Road/Santa Clara parks planning sub- <br />area is discussed above under Section I, <br />while Section II addresses the <br />characteristics required to make a site <br />suitable for a parks expansion. These site <br />characteristics fall into two categories: <br />location-based and other site <br />characteristics. Analysis of location-based <br />site characteristics (below) is the first step <br />in evaluating whether any of the fourth <br />priority land in the study area has the <br />characteristics necessary to make it <br />suitable to accommodate the needed park <br />facility. <br />Land Inside UGH <br />Major Streets <br />- Water 6vdies E.9.n. <br />Other Land Wdlim Park Expans<on Study Area <br />® Fourth Prkanty Land within Study Area <br />Appendix C to Findings May 2017 Page 34 <br />City of Eugane Urban Growtn Boundary Study <br />Park Land Evaluation • River Rvad/Santa Clara <br />Fourth Priority Land within Study Area <br />
The URL can be used to link to this page
Your browser does not support the video tag.