My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board of Commissioners Meeting Materials (6/13/17) (3)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
Board of Commissioners Meeting Materials (6/13/17) (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 1:48:01 PM
Creation date
6/19/2017 10:10:12 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB ADOPTION PACKAGE
Document Type
Staff Report
Document_Date
6/13/2017
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. First Priority Land - Apply State's Factors for Dismissal of <br />Candidate Land <br />There is no land designated for urban reserves around Eugene. Therefore, there is no first priority land <br />to consider for the proposed UGB expansion. <br />d. Second Priority Land - Apply State's Factors for Dismissal of <br />Candidate Land <br />The Bethel/Danebo park expansion study area includes 802.6 acres of second priority land, shown on <br />the "Second Priority Land within Study Area" map. The largest area of second priority land in the study <br />A City of Eugene Urban Growth Boundary Study <br />t Park Land Evaluation - Bethel/Danebo <br />Second Priority Land within Study Area <br />w <br />J <br />ATT7 <br />X <br />i <br />r <br />=Land Inside UGB Other Land Within Park Expansion Study Area <br />Major Streets - second Priority Land within Study Area <br />Water Bodies Identified School Expansion <br />Eug ne <br />- Identified Industrial Expansion <br />area is a portion of the <br />Eugene Airport, designated <br />Government and Education <br />(Metro Plan), and Airport <br />(Lane County). Other second <br />priority areas are designated <br />Rural Residential (Metro <br />Plan), and Rural Commercial <br />(Metro Plan). <br />The determination of the <br />City's need for an additional <br />community park site to serve <br />the Bethel/Danebo park <br />planning sub-area is <br />discussed above under <br />Section I, while Section II <br />addresses the characteristics <br />required to make a site <br />suitable for a park expansion. <br />These site characteristics fall <br />into two categories: location- <br />based and other site <br />characteristics. Analysis of <br />location-based site <br />characteristics (below) is the <br />first step in evaluating <br />whether any of the second <br />priority land in the study <br />area has the characteristics <br />necessary to make it suitable <br />to accommodate the needed <br />park facility. <br />Appendix C to Findings May 2017 Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.