My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board of Commissioners Meeting Materials (6/13/17) (3)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
Board of Commissioners Meeting Materials (6/13/17) (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 1:48:01 PM
Creation date
6/19/2017 10:10:12 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB ADOPTION PACKAGE
Document Type
Staff Report
Document_Date
6/13/2017
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Through the preceding analysis, the entire study area of 18,734 acres was evaluated for suitability to <br />meet the City's industrial land deficit. 633 acres were selected as the most desirable for expansion as <br />shown on the map below, "Complete Industrial Expansion Area." In accordance with City of Eugene <br />policies, this expansion area will undergo further analysis (see the Addendum to this study) to enable <br />land use planning that is sensitive to environmental issues such as wetlands not identified in the current <br />Goal 5 inventory and environmental justice concerns regarding the expansion. This further analysis may <br />lead to adjustments in the specific distribution of sites within the area, but will maintain the large lots <br />needed to meet the identified industrial need. <br />City of Eugene Urban Growth Boundary Study <br />rddk <br />4 Industrial Land Evaluation <br />TRI'MI Complete fndustrial Expansion Area <br />1 <br />„ <br />f <br />I <br />F <br />i <br />, <br />I ! <br />! Land Inside UGB <br />Tax Lots <br />0 Street Rights of Way Eugene <br />Tax Lots Selected for School Expansion <br />- Tax Lots Selected for Industrial Expansion <br />Appendix B to Findings May 2017 Page 147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.