My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board of Commissioners Meeting Materials (6/13/17) (3)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
Board of Commissioners Meeting Materials (6/13/17) (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 1:48:01 PM
Creation date
6/19/2017 10:10:12 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB ADOPTION PACKAGE
Document Type
Staff Report
Document_Date
6/13/2017
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Conclusion for Fourth Priority Land within River Road/Santa Clara Park <br />Expansion Study Area <br />The second priority and the fourth priority land together create a 35.2 acre expansion that, in <br />association with the adjacent Madison Middle School, meet the site requirements for a community park. <br />The site is composed of five tax lots, as shown on the "Site Selected for Park Expansion" map. This <br />expansion meets the land need for a new River Road/Santa Clara community park without the need for <br />non-park land to be brought into the UGB in this area. <br />Based on the above findings and analysis, the City finds that the areas identified in the "Site Selected for <br />Community Park Expansion" map for each park planning area are the most suitable sites for new <br />community parks to serve the Bethel/Danebo park planning sub-area and the River Road/Santa Clara <br />park planning sub-area. <br />City of Eugene Urban Growth Boundary Study <br />Park Land Evaluation • Bethelil7aneho <br />Site Selected for Park Expansion <br />~ Land Inside LIGB I__, Tax Lots Required for contiguous LtGB <br />I~ Land inside UGB <br />Mater Streets uvu.: <br />b ~ MaJar SVeels <br />1+~ "rater Bodies <br />SAiat- Bodies <br />Otne• Land Within Park Expansion Study Area Eug no <br />iJx LOIS Salected for Park Expan it Other Land NAlhin Park Expansion Study Area <br />Madison Middle School <br />Ide'ltlLetl Scrvool Expanswn _ <br />'fax Lots Selected for Park Expansion <br />® IdennS¢d lndustnal Expansion , <br />EJ <br />Appendix C to Findings May 2017 Page 40 <br />City of Eugene Urban Growth Boundary Study <br />Park Land Evaluation - River Road+Santa Clara <br />Site Selected for Park Expansion <br />
The URL can be used to link to this page
Your browser does not support the video tag.