The map "Subarea P2.6: Site Characteristics of Unconstrained Land" shows the remaining / <br />unconstrained land in Subarea P2.6 with the following site characteristic elements displayed: <br />Dismissal of sites that are more than 1 mile by road from access to a State Designated Freight Route <br />The nearest State Designated Freight Route to Subarea P2.6 is Highway 126. No remaining land <br />under consideration in this subarea is within one mile of Highway 126.24 <br />Dismissal of land that could not accommodate one of the following sites on a contiguous area comprised <br />of one or two tax lots: <br />• an industrial site of 75 acres or larger (Eugene needs to add 2 such sites) <br />• an industrial site of between 50 and 75 acres (Eugene needs to add 3 such sites) <br />• an industrial site of between 20 and 50 acres (Eugene needs to add 2 such sites) <br />• an industrial site of between 10 and 20 acres (Eugene needs to add 4 such sites) <br />As explained above, no sites in Subarea P2.6 remain for consideration under this criterion. <br />Subarea P2.6 Summary. Based on these <br />findings, the City has determined that none of <br />the land in Subarea P2.6 is suitable for <br />industrial expansion. <br />(7) Subarea P2.7 <br />Subarea P2.7 is located to the <br />southwest of the current UGB, near <br />Green Hill Road and Highway 126, as <br />shown on the "Extent" map. This <br />subarea is composed of 59.1 acres of <br />second priority land designated Rural <br />Residential. <br />(a) Dismiss Candidate Land <br />with "Development <br />Constraints" - Factors that <br />Temporarily or Permanently <br />Limit or Prevent Use of Land <br />to Address the Identified <br />Industrial Land Deficit <br />City of Eugene Urban Growth Boundary Study <br />tndustriai Land Evaluation <br />Subarea P2.7: Extent <br />Subarea Boundary <br />Current Eugene UGB <br />t~J Street Rights of way <br />Major Streets <br />Second Priority Land <br />~~oarlr <br />24 Were these sites not discarded for distance from a Freight Route, they would be discarded for insufficient size to <br />meet the identified site characteristics. <br />Appendix B to Findings May 2017 Page 37 <br />