The map "Subarea P2.6: <br />Development Constraints" <br />shows the development <br />constraints present in <br />Subarea P2.6. See constraint <br />maps, in Section ILb above, <br />showing the location of each <br />development constraint <br />throughout study area. The <br />map "Subarea P2.6: <br />Development Constraints" is <br />a visual representation of the <br />following information: <br />Dismissal of Land with Slopes <br />in Excess of 5 Percent Grade <br />The United States Geological <br />Survey's 10-meter digital <br />elevation model shows that <br />112.6 acres of the land in <br />Subarea P2.6 (99 percent) are <br />constrained by slopes greater <br />than 5%. <br />Dismissal of Land within <br />FEMA Flood Zones (Special <br />Flood Hazard Area) <br />None of the land in Subarea <br />P2.6 is constrained by the <br />FEMA mapped Special Flood <br />Hazard Area. <br />None of the land in Subarea P2.6 is constrained by Lane County Goal 5 protections. <br />Dismissal of Land with Existing Uses/Development that makes Industrial Redevelopment Highly Unlikely <br />in Planning Period <br />None of the land in Subarea P2.6 is constrained by existing uses or development. <br />Summary of Development Constraints <br />In all, 112.6 acres of the land in Subarea P2.6 have one or more development constraints <br />("factors that temporarily or permanently limit or prevent the use of land for economic <br />development" per OAR 660-009-005(2)). The remaining 1.2 acres of land in Subarea P2.6 are <br />addressed below. <br />Appendix B to Findings May 2017 Page 35 <br />Dismissal of Land with Goal 5 Protections (natural resources) <br />