My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Employment, Parks, Schools Ordinance (County) (all other)- Planning Commission Recommendation (3 of 4)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
Employment, Parks, Schools Ordinance (County) (all other)- Planning Commission Recommendation (3 of 4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 1:48:03 PM
Creation date
5/22/2017 2:16:45 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB ADOPTION PACKAGE
Document Type
Misc.
Document_Date
5/22/2017
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Land Inside UGB F_~ Saes mihodt Collector or Arterial Access <br />Major Streets GeooraphlC Attributes <br />Vvater Bodies /~.,,✓f Srtes Unavailable for City Ownership <br />Madison Middle School Sites Not Acpace nt In School Site Eugene <br />Second Priority Land Pending Fourth Priority Analysry Sites Lackirg Substantial Natural Fewures <br />17-1 Other Land Within Park Expansion Study Area <br />Size <br />• Dismissal of Sites with Fewer than 40 Acres <br />The remaining second priority land is highly parcelized. Based on tax lot ownership, the <br />remaining tax lots form fifty-three (53) sites, none of which are of sufficient size, either <br />independently or in association with a school facility, for a community park. Because these small <br />sites of second priority land could be combined with lower priority land that has yet to be <br />evaluated, sites that meet the remaining other site characteristics will be reconsidered as part of <br />the parks expansion with fourth priority land. In light of this possibility, no second priority land is <br />dismissed on this basis. <br />Appendix C to Findings May 2017 Page 32 <br />City of Eugene Urban Growth Boundary Study <br />Park Land Evaluation - River RoadlSanta Clara <br />Second Priority Land: Other Site Characteristics <br />
The URL can be used to link to this page
Your browser does not support the video tag.