(b) Dismiss Remaining Candidate Land that Cannot Reasonably <br />Accommodate the Specific Types of Land Needs / Cannot be <br />Expected to Provide the Appropriate Site Characteristics for the <br />Proposed Use <br />City of Eugene Urban Growth Boundary Study <br />x Industrial Land Evaluation <br />Subarea P4.8: Site Characteristics of Unconstrained Land <br />P4.8c P4 .8d K P4.8a I.Sd <br />P4.8h P4.8e <br />P4.8i <br />P4.8 <br />, <br />ii <br />4 <br />l <br />1 <br />l <br />1 <br />► ; P4.8k <br />,E y <br />' L r• ~ <br />Eugene Airport s i P4.81 <br />w M <br />a <br />i <br />fx <br />P4.8g `+tl <br />II Current. UGB <br />1 <br />i P4.8h i <br />Subarea Boundary M Second Prtortty Land Pending Fourth Priority Analysis a <br />r-• <br />Current Eugene UGH l7istalaved Site Characteristics of Unconstrained Land - <br />Taxlols - Sites More than 7 We from Freight Route <br />Street. Rights of Way - SReS of Insufficient Size within 1 Mile of Freight Rcute <br />Major Streets Fourth Priority Land for Further Consdderaaon Eugene <br />Designated Freight Route <br />Streets within a Mile of Freight Route Acce55 <br />Constrained Land <br />Appendix B to Findings May 2017 Page 109 <br />