My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Employment, Parks, Schools Ordinance (City)- Planning Commission Recommendation (3 of 4)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
Employment, Parks, Schools Ordinance (City)- Planning Commission Recommendation (3 of 4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 1:48:03 PM
Creation date
5/16/2017 2:41:17 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB ADOPTION PACKAGE
Document Type
Misc.
Document_Date
5/16/2017
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Map 8 of the Eugene Metropolitan Area Public Facilities and Services Plan entitled <br />"Public Service Availability in the Eugene-Springfield Metropolitan Area" is hereby <br />amended as to remove the following projects: <br />Eugene Water & Electric Board Water System Improvement Projects: <br />107 <br />Green Hill/Airport mainline <br />108 <br />EWEB/Seneca 42-inch transmission line <br />109 <br />City View reservoir (800) <br />110 <br />Hayden Bridge Expansion and 10mg Reservoir and pump gallery <br />219 <br />Hayden Bridge-former fish hatchery intake modifications <br />220 <br />Laurel Hill reservoir (850) <br />223 <br />Shasta reservoir (1150) <br />226 <br />Elliot reservoir (607) <br />227 <br />Willamette reservoir (1325) <br />229 <br />Timberline reservoir (1100) <br />230 <br />Timberline pump station (1325) <br />235 <br />Westside/Cantrell Hill reservoir (607) <br />236 <br />Westside Transmission Main <br />237 <br />Glenwood/LCC Basin intertie <br />City of Eugen <br />e Wastewater System Improvement Projects <br />100 <br />West Eugene Bypass (48-inch) <br />101 <br />North River Road pump station <br />102 <br />North Willakenzie gravity sewers <br />103 <br />North Enid pump station <br />200 <br />North Willakenzie pump station <br />City of Eugene Stormwater System Improvement Projects <br />1 River Point Pond Outlet Channel <br />2 Federal Priority Project- Delta Ponds Enhancement <br />5 Ayers Pond Outfall Retrofit <br />8 Riverview/Augusta Bypass and System Improvements <br />9 Minor System Between Riverview and Augusta <br />12 Green Hill Tributary Stream Enhancements <br />23 West Irwin Storm <br />20 Kinney Park Neighborhood Facility <br />22 Martin Drive Pipe Improvements <br />24 Hilyard Street Pipe Improvements <br />30 43rd Avenue Pipe Improvements <br />45 Polk Street Water Quality Facilities <br />47 Willamette Overflow Channel Upgrade <br />48 Irvington Road Drainage Improvements <br />49 River Road Drainage Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.