My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Employment, Parks, Schools Ordinance (City)- Planning Commission Recommendation (3 of 4)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
Employment, Parks, Schools Ordinance (City)- Planning Commission Recommendation (3 of 4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 1:48:03 PM
Creation date
5/16/2017 2:41:17 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB ADOPTION PACKAGE
Document Type
Misc.
Document_Date
5/16/2017
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Quality Facilities for High Source Areas <br />City-wide Projects Long-Term (not mapped) <br />[C;h;;R°`c.l E",;eRge `r eg6iisi# r] <br />Stormwater Rehabilitation <br />Water Quality Facilities for High Source Areas <br />[River Read-Santa Clara Basin Short-Term <br />[4-7 <br />n.,p4ley., <br />[49 <br />IFV*RgtGR RG@d hr"iv. a !R;,,.. r*c] <br />River Road-Santa Clara Basin Long-Term <br />50 <br />Water Quality Project <br />51 <br />Flat Creek Low Flow Channel Upgrade <br />52 <br />Upgrade Existing Pipe <br />53 <br />A-1 Channel Upgrade <br />54 <br />Water Quality Facility <br />55 <br />Flat Creek Water Quality Facility <br />56 <br />Spring Creek Water Quality Project <br />57 <br />Spring Creek Culvert Replacement <br />58 <br />A-1 Channel, West Tributary Improvements <br />Clear Lake UGB Expansion Area Long-Term <br />59 <br />Awbrey Lane at Highway 99 Culvert Upgrade/Channel Capacity <br />Enhancements <br />60 <br />Green Hill Road/ North of Old Airport Road <br />Channel/Culvert Improvements <br />61 <br />Green Hill Road to Awbrey Lane Channel/Culvert Improvements <br />62 <br />Clear Lake Road Channel/Culvert Improvements <br />63 <br />New Open Channel West of Terry Street (includes estimated <br />acquisition cost) <br />• Map 1 of the Eugene Metropolitan Area Public Facilities and Services Plan entitled <br />"Planned Wa <br />ter Facilities" is hereby amended as to remove the following projects: <br />107 <br />Green Hill/Airport mainline <br />108 <br />EWEB/Seneca 42-inch transmission line <br />109 <br />City View reservoir (800) <br />110 <br />Hayden Bridge Expansion and 10mg Reservoir and pump gallery <br />219 <br />Hayden Bridge-former fish hatchery intake modifications <br />220 <br />Laurel Hill reservoir (850) <br />223 <br />Shasta reservoir (1150) <br />226 <br />Elliot reservoir (607) <br />227 <br />Willamette reservoir (1325) <br />229 <br />Timberline reservoir (1100) <br />230 <br />Timberline pump station (1325) <br />235 <br />Westside/Cantrell Hill reservoir (607) <br />236 <br />Westside Transmission Main <br />237 <br />Glenwood/LCC Basin intertie <br />
The URL can be used to link to this page
Your browser does not support the video tag.