Eugene Ordinance Exhibit C-1 <br />[Lane County Ordinance Exhibit C-1] <br />Eugene Metropolitan Area Public Facilities and Services Plan Amendments <br />• Table 1 of the Eugene Metropolitan Area Public Facilities and Services Plan is amended <br />as follows: <br />Table 1 <br />Eugene Water & Electric Board (EWER) Water System Improvement Projects <br />Project <br />Project Name/Description <br />Short-Term <br />111 <br />Hawkins Hill reservoir seismic upgrades <br />112 <br />Willamette reservoir (800) replacement <br />113 <br />Shasta constant run pump station (1150) <br />114 <br />Willamette pump station (975) <br />115 <br />Crenshaw pump station (800) <br />116 <br />Hawkins View pump station (1150) <br />117 <br />Crest pump station (1150) replacement <br />1 218 1 Back-up well field development area I <br />221 Laurel Hill reservoir and pump station (975) <br />222 Laurel Hill pump station (1150) <br />224 Dillard reservoir (975) and pump station (1150) <br />225 Dillard reservoir (1150) <br />228 Willamette pump station (1500) <br />[fig Tup;he lupe r " /1199\] <br />[2-4-g T-*Rq L.eF!*Re pump statieR (192--G4] <br />231 Gimple Hill reservoir (975) and pump station <br />232 Green Hill reservoir (800) <br />233 Green Hill reservoir (975) <br />234 Green Hill pump station (975) <br />\AL stsi.J„/r'-,ptrefl Will r "/cnT\] <br />238 Santa Clara pump station and 5 MG reservoir at the existing Santa Clara <br />pump station and reservoir site. <br />239 College Hill 5 MG reservoir and decommission existing College Hill 15 <br />MG reservoir <br />240 Construct 10,000 feet of 36-inch pipeline in 23rd Avenue and Alder <br />Street <br />