'ALI <br />Figure 2. Employment Land Supply (2012-2032) <br />Map the 17 of 18 <br />Franldin'B~~d <br />E 16th,q~ ~j <br />EE~ <br />C <br />~ <br />Fo a <br />/ N <br /> <br />co <br />o ~ <br />`um.. QS mrnit P, co <br />e <br />7 m ~ \ <br />C <br />0 <br />c <br />a <br />i <br />i ll amet, <br />~ ~ZJe <br />p <br />F3 <br />oth <br />~ to \ ~ <br />r ~ <br />Gon.. a_Rd-Se <br />Ramp 40 ~,Aa.L <br />Urban Growth Boundary D 2012 BLI Taxlots - Major Streets o o.zs oI Miles <br />N <br />- - UGB Expansion Boundary Water Bodies Rail Road May 2017 <br />Plan Designations -Vacant Employments Lands Caution: This map is subject to change and for use within the scope of <br />the May 2017 Review. This map is not suitable for legal, engineering, or <br />Commercial KN Special Heavy Industrial Government & Education Datta a So SUfV Souurrcesces: : City <br />City <br />- of Eugene, RLI D. <br />- The land supply was conducted at a sub-tax lot level analysis; tax lot <br />® Major Retail Center Light Medium Industrial Parks and Open Space boundaries are shown for reference only and may change over time. <br />- For assumed capacity of land shown on the land supply, see Table 5 of <br />N` Commercial Mixed Use 21i Campus Industrial N` Parks/Open Space Mixed Use Part VI. <br />Heavy Industrial University Research ~N Mixed Use <br />Partially Vacant (PV) or Redevelopment Employment Lands ® Industrial (IND) vacant - 10 acres s <br />Industrial (IND) Partially Vacant/ Redevelopment Employment (E) Zone _910 11 12 <br />0 Commercial (COM) Partially Vacant Developed Commercial & Industrial Lands 1a 15 1 <br />Committed or Protected Lands (in UGB) 18 <br />