Figure 2. Employment Land Supply (2012-2032) 'ALI <br />Map tile 14 of 18 <br />- , -A FTT <br />W~13t_h_~ E <br />Fi <br />HE] wmg D., <br />o <br />W 1.8th Ave <br />c <br />7 <br />Q) 17) <br />O ~;z~ <br />9t <br />A <br />on <br />ve I <br />~a <br />~I <br />~ <br />6a <br />L N~ <br />cu~ <br />W <br />25th Ave F~~v <br />W 28th~Ave <br />Tw <br />~O(D <br />o <br />o <br /> <br />° <br />6 <br />0 <br />g <br />0) <br />° <br />~0% <br />~ ° <br />08 88 <br />C <br />oz o <br />e <br />o <br />o <br />~ <br />° <br />~c <br />~ <br />D <br />~ <br />o <br />O <br />Gimp ill <br />a~ <br />R <br />d ~Wint~ <br />° <br />m <br />H <br />Lorane <br /> <br />Urban Growth Boundary D 2012 BLI Taxlots -Major Streets Miles 0 0.25 0.5 N <br />- - - UGB Expansion Boundary Water Bodies Rail Road May 2017 <br />Plan Designations -Vacant Employments Lands Caution: This map is subject to change and for use within the scope of <br />the May 2017 Review. This map is not suitable for legal, engineering, or <br />Commercial KN Special Heavy Industrial Government & Education Datta a So SUfV Souurrcesces: : City <br />City <br />y - of Eugene, RLI D. <br />- The land supply was conducted at a sub-tax lot level analysis; tax lot <br />® Major Retail Center Light Medium Industrial Parks and Open Space boundaries are shown for reference only and may change over time. <br />- For assumed capacity of land shown on the land supply, see Table 5 of <br />Commercial Mixed Use 21~ Campus Industrial Parks/Open Space Mixed Use Part VI. <br />Heavy Industrial University Research Mixed Use <br />Partially Vacant (PV) or Redevelopment Employment Lands ® Industrial (IND) vacant - 10 acres s <br />7 a <br />Industrial (IND) Partially Vacant/ Redevelopment Employment (E) Zone 9 10 11 12 <br />0 Commercial (COM) Partially Vacant Developed Commercial & Industrial Lands 1a is 1 <br />Committed or Protected Lands (in UGB) 18 <br />