Figure 2. Employment Land Supply <br />Map the 7 of 18 <br />(2012-2032) <br />'ALI <br />Huns _ ke ru <n <br />II <br />Ayres-Ra <br />a~ <br />i <br />q <br />r <br />Div`ision Ave <br />! <br />• ' <br />_ <br /> <br />y <br />~ <br />Silver Ln River Ave <br /> <br /> <br />- <br />~ \ Gr <br />e <br />e <br />h Acres Rq <br />- asture Nb <br />Ma.- --l-Rd <br />~ ~ <br />~ ~Oe~ta Conn <br />Howard Ave <br />l <br />O Q <br />c <br />TI <br />Horn Lin br] <br />~inda=D <br />~O <br />CC Young-Rd <br />_0 <br />ca <br />m. <br />L Park Ave <br />a <br />~m <br />I <br />' <br />ICU <br />of a <br />0i <br />Urban Growth Boundary D 2012 BLI Taxlots -Major Streets <br />0 0.25 <br />Miles <br />0.5 N <br />- - - UGB Expansion Boundary Water Bodies Rail Roa <br />d May 2017 <br />Plan Designations -Vacant Employments Lands <br />Caution: This map is subject to change <br />and for use within the scope of <br />the May 2017 Review. This map is not su <br />itable for legal, engineering, or <br />Commercial KN Special Heavy Industrial Government & Education Datta a So SUfV Souurrcesces: : City <br />City <br />y - of Eugene, RLI D. <br />- The land supply was conducted at a sub-tax lot level analysis; tax lot <br />® Major Retail Center Light Medium Industrial Parks and Open Space boundaries are shown for reference only and may change over time. <br />- For assumed capacity of land shown on <br />N` Commercial Mixed Use 21~ Campus Industrial N` Parks/Open Space Mixed Use Part VI. <br />the land supply, see Table 5 of <br />Heavy Industrial University Research ~N Mix <br />ed Use <br />Partially Vacant (PV) or Redevelopment Employment Lands <br />® Industrial (IND) vacant - 10 acres <br />6 <br />Industrial (IND) Partially Vacant/ Redevelopment <br />Employment (E) Zone <br />~ a <br />9--~ 10 11 lz <br />0 Commercial (COM) Partially Vacant <br />Developed Commercial & Industrial Lands <br />la is 1 <br />Committed or Protected Lands (in UGB) <br /> <br />