My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Employment, Parks, Schools Ordinance (City)- Planning Commission Recommendation (3 of 4)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
Employment, Parks, Schools Ordinance (City)- Planning Commission Recommendation (3 of 4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 1:48:03 PM
Creation date
5/16/2017 2:41:17 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB ADOPTION PACKAGE
Document Type
Misc.
Document_Date
5/16/2017
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eugene Ordinance Exhibit H <br />[Lane County Ordinance Exhibit E] <br />D. In the "Total Acres" column for site no. E56 (River Loop No.1) on the table <br />titled "Goal 5 Riparian and Upland Wildlife Habitat Sites within the Eugene Urban <br />Growth Boundary" in Section III, replace the "2.3" with "4.09." <br />E. Add the following text and table immediately following the table titled "Goal <br />5 Riparian and Upland Wildlife Habitat Sites within the Eugene Urban Growth <br />Boundary" in Section III: <br />As part of Eugene's urban growth boundary adoption in 2017, the following riparian corridor was <br />identified as a significant Goal 5 Riparian Corridor. <br /># <br />Site Name <br />0 <br />Significant" <br />N <br />~ a <br />N. <br />36 <br />CL-R <br />A-3 Channel <br />R <br />Yes <br />38.37 <br />R=Riparian Corridor <br />Significance based on OAR 660-023-0030(4)(a). <br />F. Revise the table entitled "ESEE Conclusions Summary Table - Riparian Corridor <br />Sites" in Section IV of the Goal 5 Water Resources Conservation Plan as follows: <br />PROPOSED <br />SUB- <br />PROPOPSED <br />SETBACK <br />ESEE <br />SITE <br />SITE <br />ESSEE <br />PROTECTION <br />(Feet from <br />CONCLUSIONS <br />SITENAME <br />LABEL <br />LABEL <br />TYPE <br />ACRES <br />CONCLUSION <br />LEVEL <br />TOB <br />MAP NUMBER <br />River Loop <br />E56 A- <br />8:-64 <br />Limit Conflicting <br />Stream <br />No. 1 <br />E56 <br />2 <br />R <br />1.99 <br />Uses <br />Category D <br />20 <br />16 <br />River Loop <br />8-97- <br />Limit Conflicting <br />Stream <br />No. 1 <br />E56 <br />E56 B <br />R <br />1.61 <br />Uses <br />Category D <br />20 <br />16 <br />G. Add the following three rows (for the A-3 Channel) to the table entitled "ESEE <br />Conclusions Summary Table - Riparian Corridor Sites" in Section IV of the Goal 5 Water <br />Resources Conservation Plan: <br />Page 2 of 4 <br />May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.