My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPLICATION COMPLETENESS REVIEW
>
OnTrack
>
PT
>
2017
>
PT 17-7
>
APPLICATION COMPLETENESS REVIEW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 4:00:19 PM
Creation date
5/2/2017 10:56:34 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PT
File Year
17
File Sequence Number
7
Application Name
FURTICK PARTITION
Document Type
Application Completeness Review
Document_Date
4/26/2017
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Partition, Tentative Plan Completeness Re-,iew Form <br />Public Works Department <br />Application File Name <br />PT 17-07 Furttck Partition <br />Date: <br />4/34/17 <br />Reyiewedby: <br />Deanna Smith <br />Phone:. 1 <br />541-682-5714 <br />General <br />Comments: <br />Wastewater Requirements <br />Submitted <br />Missing <br />Incomplete <br />N/A <br />❑ <br />❑ <br />❑ <br />1. Show location of the existing public wastewater system and flow line <br />elevation at proposed connection point(s). <br />© <br />❑ <br />❑ <br />❑ <br />Show existing and proposed wastewater sewer layout, including service <br />to each lot (each lot must be connected to a public wastewater sewer). <br />Cormnents <br />As an informational item, the proposed wastewater extension will need to be located within the existing right-of- <br />way and will not be allowed to be extended as shown within casements on adjacent property. <br />Additionally; as an informational item, the standard is to provide a 6-inch lateral to the propem and install a wve <br />with two service lines, one for each parcel at the property line. <br />- Storm Drainage Requirements <br />Submitted <br />Missing <br />Incomplete <br />N/A <br />❑ <br />❑ <br />❑ <br />0 <br />3. Delineate the Special Flood Hazard Area. <br />4. Delineate the tops-of-banks of all open watemays on and adjacent to the <br />❑ <br />E:] <br />E] <br />0 <br />property and describe extent of impacts and/or relocation work due to <br />proposed development request. <br />. Show existing and proposed flood control facilities, including collection, <br />❑ <br />E] <br />❑ <br />conveyance, and treatment of stormwater in compliance with SW <br />Management Manual, within and adjacent to development site. <br />❑ <br />❑ <br />❑ <br />© <br />6. Show location of the existing piped public system and flow line elevation <br />at proposed connection point(s). <br />7. Application proposes no construction of public or private streets or <br />❑ <br />❑ <br />❑ <br />® <br />shared driveways; provide a site development plan that delineates <br />infiltration rates, bedrock oundwater elevations. and ground slopes. <br />8. Application proposes construction of public streets, provide stormwater <br />treatment plan for public streets based on infiltration, filtration, or <br />❑ <br />❑ <br />Z <br />❑ <br />mechanical priority and include sizing calculations that demonstrate <br />whether treatment of runoff from adjoining lots will be on-site or in <br />public mfiltration or filtration facility in the right of way. <br />9. Application proposes construction of private street(s) and/or shared <br />driveway(s); provide stormwater treatment plat) for private street(s) and <br />❑ <br />❑ <br />0 <br />❑ <br />shared drivewav(s) based on infiltration and filtration priority and <br />include sizing calculations that demonstrate whether treatment of runoff <br />from adjog lots will be on-site or in private shared facility. <br />10. Application /CUP/SR/PLD) includes impervious surface area to be <br />❑ <br />❑ <br />❑ <br />❑ <br />constructed with a future development permit, provide stormwater <br />treatment plan and analysis for runoff from impervious surface area <br />based on infiltration, filtration or payment prioritv. <br />I l If applicable. identify flow control by demonstrating how there is no <br />❑ <br />❑ <br />❑ <br />increase in flow rates or volumes if contnbutine to a Headwaters Area <br />waterway, per EC 9.6793 3)(a). <br />❑ <br />❑ <br />❑ <br />❑ <br />l3. The applicant has submitted approval from Lane County for proposed <br />stormwater discharge to Lane County systems. <br />Please use the written statement to demonstrate with a narrative as to how the proposal meets the stormwater <br />comments: <br />standards. The stormwater report may be referenced for supporting calculations and design details. <br />For example, the paragraphs in section 4.0 of the Stormwater Management Plan and Drainage Studv. regarding <br />
The URL can be used to link to this page
Your browser does not support the video tag.