Rain Gardens and Vegetated Swales for stormwater destinations, and the City of Eugene <br />has verified that the proposed facility meets requirements of no facility flooding and the <br />maximum of 18 hour drawdown times. Furthermore; our proposed facility meets the <br />flow control standards requiring that the post development offsite flow be less or equal to <br />pre-development flow. This has also been addressed by Neil Bjorklund, the Parks and <br />Open Space Planning Manager, in his letter on record addressed July 11`h, 2013. <br />Sincerely, <br />c <br />Willard C. Dixon, AIA <br />OMC Project Manager <br />Principal, Willard C. Dixon Architect, LLC <br />2013 AIA-Southwestern Oregon President <br />