My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LUBA RET. EXT 2014-001 VOL 3 of 3
>
OnTrack
>
PDT
>
2013
>
PDT 13-1
>
LUBA RET. EXT 2014-001 VOL 3 of 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 4:32:31 PM
Creation date
3/28/2017 3:36:18 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
13
File Sequence Number
1
Application Name
OAKLEIGH COHOUSING
Document Type
LUBA Materials
Document_Date
2/28/2014
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:ale ` M E A D 0 W <br />a Zm., C 0 h O C S f\ C <br />~e~e°'a .•e c~ea°so <br />(Policy G.20) Maintain flood storage capacity within the floodplain, to the. <br />maximum extent practical, through measures that may include reducing <br />impervious surface in the floodplain and adjacent areas. <br />Findings: The proposed development places special emphasis upon surface <br />water supplies when planning for stormwater facilities. Please see the <br />attached civil engineering drawings, stormwater analysis, and geotechnical <br />investigation for further information. <br />(Policy G.36) Require development to pay the cost, as determined by the <br />local jurisdiction, of extending urban services and facilities. This does not <br />preclude subsidy, where a development will fulfill goals and <br />recommendations of the Metro Plan and other applicable plans determined <br />by the local jurisdiction to be of particular importance or concern. <br />Findings: As mentioned above in this statement, Oakleigh Meadow LLC is <br />financially responsible for this project and as such will pay the cost of <br />development as it works with the City of Eugene and local jurisdictions to <br />fulfill goals and recommendations of the Metro Plan. <br />METRO PLAN - SPECIFIC ELEMENTS: (I) ENERGY ELEMENT <br />• (Goal 1) Maximize the conservation and efficient utilization of all types of <br />energy. <br />(Objective 7) Continue and intensify efforts to allocate land uses in a manner <br />that creates a compact growth form for the metropolitan area. <br />(Objective 8) Promote policies that minimize the energy consumed for <br />heating, cooling, lighting, appliance use, and other processes in commercial, <br />industrial, and residential buildings. <br />(Objective 9) Encourage the maximum amount of energy conservation <br />associated with automobile use. <br />(Objective 11) Encourage the minimization of energy consumption,in <br />determining the placement, density, and design of all types of urban land . <br />uses. <br />(Objective 12) Continue and support energy conservation efforts that are <br />being undertaken by the public and private sector. <br />Findings: The development proposes reduced energy consumption during <br />the lifetime of this project primarily with highly-efficient technologies, tried- <br />and-true construction details, and the use of shared walls. For further <br />evidence and analysis showing compliance with this criterion, please refer to <br />Planned Unit Development, Tentative Plan permit application filed <br />• concurrently with this application. <br />Willamette &eenway -June 14, 2013 Page 14 of 20 Oakleigh Cohousing WG 13-0001 <br />1349 <br />
The URL can be used to link to this page
Your browser does not support the video tag.