I <br />NO. ITEM DESCRIPTION PAGE <br />i. E-mail from Karen Hecht and Dan Bessette, received September 29, 2013 .....1103 <br />j. <br />Letter from Scott Clarke, received September 28, 2013 <br />1104 <br />k. <br />E-mail from Bryn Thorns, received September 28, 2013 <br />1105 <br />1. <br />Letter from Sandy Thorns, received September 28, 2013 <br />1106 <br />M. <br />E-mail from Nicole Lawless, received September 28, 2013 <br />1110 <br />n. <br />E-mail from Suzanne Kelley, received September 28, 2013 <br />1111 <br />o. <br />E-mail from Jim and Sophie Swirczynski, received September 28, 2013 <br />1112 <br />p. <br />Letter from Daneen Justice, received September 28, 2013 <br />1113 <br />q. <br />E-mail from Christine Robins, received September 28, 2013 <br />1115 <br />r. <br />Letter from Michael Weishar, Access Engineering, received September 27, <br />2013 <br />1116 <br />S. <br />Letter from Will Dixon, received September 27, 2013 <br />1117 <br />t. <br />Letter from Maureen McCauley, received September 27, 2013 <br />1126 <br />U. <br />Letter from Travis Sheridan, received September 27, 2013 <br />1127 <br />V. <br />E-mail from Stan Paulic, received September 27, 2013 <br />1128 <br />W. <br />Letter from Paul Edlund, received September 27, 2013 <br />1129 <br />X. <br />Letter from Paul Dustrud, received September 27, 2013........... <br />1130 <br />y. <br />E-mail from Karl and Silvia Bennet, received September 27, 2013 <br />1131 <br />Z. <br />E-mail from Bonita Nussbaum, received September 27, 2013 <br />1132 <br />aa. <br />Letter from Sandy Thorns, received September 27, 2013 <br />1133 <br />bb. <br />Letter from Judy Scott, received September 27, 2013 <br />1135 <br />cc. <br />E-mail from Sabine Wilke, received September 27, 2013... <br />1136 <br />dd. <br />Letter from Jane Towne, received September 27, 2013 <br />1137 <br />ee. <br />E-mail from Barbara Frerichs, received September 26, 2013 <br />1139 <br />ff. <br />Letter from Anthony Towne, received September 26, 2013 <br />1140 <br />gg. <br />E-mail from Maj Hutchinson, received September 26, 2013 <br />1142 <br />hh. <br />E-mail from Ethan Hutchinson, received September 26, 2013 <br />1145 <br />ii. <br />Letter from Hal Stedman, received,September 26, 2013 <br />1146 <br />jj. <br />E-mail from Scott Stedman, received September 26, 2013 <br />1148 <br />kk. <br />E-mail from Rachel Stedman, received September 26, 2013 <br />1149 <br />11. <br />Letter from Shawn Johnson, received September 26, 2013 <br />1151 <br />mm. <br />E-mail from James and Sharon Brandt, received September 26, 2013 <br />1154 <br />nn. <br />E-mail from Jim and Ruby Bauer, received September 25, 2013 <br />1155 <br />26. Hearings Official staff report, with attachments, dated September 25, 2014 [Color copy of <br />attachments at RE-T] .............:.:...................................................................................1156 <br />a. Attachment A - Vicinity Ma 1196 <br />b. Attachment B -Right-of-way Dedications .........................................................1197 <br />c. Attachment C -Bicycle/Pedestrian Connections ................................................1198 <br />d. Attachment D -Reduced Excerpt Application Materials: <br />i. D-1: Topography map by Poage Engineering .......................................1199 <br />ii. D-2: Site Plan A1.1 ...............................................................................1200 <br />iii. D-3: Detail of north property line setbacks ...........................................1201 <br />iv. D-4: Tree Preservation and Removal Plan ............................................1202 <br />V. D-5: Figure 1 Street Connectivity Study by Access Engineering .........1203 <br />(00123429;11 - 6 - <br />• <br />C7 <br />