My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LUBA 076/077 RET. EX RE-5
>
OnTrack
>
PDT
>
2013
>
PDT 13-1
>
LUBA 076/077 RET. EX RE-5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 4:32:32 PM
Creation date
3/27/2017 2:28:14 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
13
File Sequence Number
1
Application Name
OAKLEIGH COHOUSING
Document Type
LUBA Materials
Document_Date
5/15/2014
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Added Conditions of Approval: <br />• The final PUD plans shall show a building setback of 5 feet from the front property line along <br />the newly dedicated right-of-way boundary for Oakleigh Lane. A 10 foot setback shall be shown <br />along the remainder of the north property line, along the newly dedicated right-of-way for a <br />bike/pedestrian path. (See related Condition #3.) <br />The final PUD plans shall show landscaping along the north property line consistent with the <br />applicant's proposed landscape plan (Sheet L2 of Exhibit PH-69), but moved south within the <br />required 5-foot setback, outside of the newly dedicated right-of-way for Oakleigh Lane. The <br />applicant shall also revise the site-plans to.show landscaping that meets the City's L-2, standard <br />at EC 9.6210, withipthe required 10=foot setbacks along the remainder of the north property <br />line, but without the requirement for additional canopy trees. <br />Condition of Approval #13 (as modified/replaced): <br />• . The final PUD plans shall show the applicant's proposal for "espaliered" trees along the outside <br />face of the proposed wall as a requirement. Plans shall also be revised to show a minimum 5- <br />foot setback for the wall along the west and south boundaries of the site. The required <br />landscaping shall be the responsibility of the owner(s) and maintained as a requirement of the <br />PUD approval. <br />• <br />edition of Approval #15 (as modified/replaced): <br />The final PUD'plans-shalkshow landscaping along the southern property line;rneeting the High <br />Screen Landscape Standard (L-3) at EC-9 6210(3);=except for the;portio'n of the south property <br />line which includes a proposed wall for screening of the` parking a'nd a cess:,area see°related <br />condition #13) Additional la ndscape.screening is.not"required along the eastern property; <br />boundary <br />Accordingly, PUD approval is hereby affirmed. The foregoing findings and conclusions are adopted as <br />the Final Order of the Eugene Planning Commission for Oakleigh Meadows Co-Housing PUD (PDT 13-1) <br />this day of December, 2013. <br />William Randall, Chair <br />Eugene Planning Commission <br />Attachment A: December 11, 2013 City Attorney Memo from Anne Davies <br />• <br />{00109077;1 } <br />DRAFT Final Order <br />Page 12 <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.