My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPLICATION MATERIALS
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
APPLICATION MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 4:04:22 PM
Creation date
3/7/2017 10:01:45 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Application Materials
Document_Date
3/3/2017
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />FORM O & M: OPERATIONS & MAINTENANCE PLAN <br />REQUIRED IN ACCORDANCE WITH THE CITY CODE <br />Project Building Application <br />Owner's Name: <br />Phone No. <br />Mailing Address: <br />Site Address: <br />Site Map and Tax lot No. <br />Requirements <br />1) Stormwater Management Site Plan, (min. 8'/z" x 11" attached to this form) showing the location of <br />the facility(ies) in relation to building structures or other permanent monuments on the site, sources <br />of runoff entering the facility(ies), and where stormwater will be discharged to after leaving the <br />facility(ies). <br />The stormwater management facility(ies) shown on the site plan are a required condition of <br />building permit approval for the identified property. The owner of the identified property is <br />required to operate and maintain the facility(ies) in accordance with the Operations and <br />Maintenance (O&M) Plan on file with the City. The O&M Plan for the facility(ies) is/are available <br />at the Public Works Department, located at 1820 Roosevelt, Eugene, Oregon between the hours of <br />8 a.m. and 5 p.m., Monday through Friday. Call (541)(682-4800). <br />2) Description of the financial method used to cover future operations and maintenance. Check One <br />Homeowner's Association Q Property Owner Account <br />Q Other (described) <br />3) Party(ies) responsible for maintenance (only if other than owner). <br />Daytime Phone no. <br />Emergency/After-hours contact phone no. - <br />Maintenance Contact party(ies) Name & Address: <br />4) Maintenance practices and schedule for the stormwater facility is included in the facility- <br />specific O&M Plan filed with the Public Works Department, City of Eugene. The operation and <br />maintenance practices are based on the publication date of the City of Eugene's Stormwater <br />Management Manual. <br />Preparation Date: 20_ <br />Revision Date: 20_ <br />Estimated Date of Installation 20` <br />By signing below, filer accepts and agrees to the terms and conditions contained in the operations & <br />maintenance plan and in any document executed by filer and recorded with it. <br />Signature of Filer: <br />Print Name: <br />
The URL can be used to link to this page
Your browser does not support the video tag.