My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPLICATION MATERIALS
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
APPLICATION MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 4:04:22 PM
Creation date
3/7/2017 10:01:45 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Application Materials
Document_Date
3/3/2017
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LL <br />00 <br />Z <br />z0 <br /> <br />_ <br />MATERIAL DESCRIPTION <br />= Q <br />w w <br />COMMENTS <br />~ <br />W <br />a <br />< <br />W w <br />a n <br />0 <br />0 <br />] <br />W <br />N N <br />TP-1 <br />(OL) DAMP, BLACK, ORGANIC SILT WITH ROOT STRUCTURES <br />- <br />- - - - - - - - - - - - - - - - - - - - - <br />a„ <br />HARD, FRACTURED SANDSTONE BEDROCK, FRESH TO SLIGHTLY WEATHERED, 2" - 8" <br />ANGULAR BLOCKY <br />° <br />5 <br />60 <br />TOTAL DEPTH OF EXCAVATION = 60" BGS <br />NOTES: NO GROUNDWATER ENCOUNTERED <br />10- <br />15 <br />T P-2 <br />(OL) DAMP, BLACK ORGANIC SILT <br />- <br />- - - - - - - - - - - - - - - - - - - - <br />(SM) DA <br />MP, BROWN, SILTY SAND <br />17' <br />- <br />_ <br />- <br />DAMP TO MOIST, ORANGE - BROWN, SLIGHTLY WEATHERED SANDSTONE, 2"- 6' <br />20" <br />GRAB SAMPLE AT 24" BGS <br />WEAKLY CEMENTED FRAGMENTS (SLIGHTLY PLASTIC SANDSTONE) <br />MOISTURE CONTENT = 19.4 % <br />FREE SWELL = 30.0 % <br />5 <br />° <br />60 <br />TOTAL DEPTH OF EXCAVATION = 60" BGS <br />NOTES: NO GROUNDWATER ENCOUNTERED <br />10- <br />15- <br />CLIENT: SCHIRMER SATRE GROUP LOGGED BY: MAD CHECKED BY: RJD <br />CONTRACTOR: DATE OF EXCAVATION: 9-30-2016 <br />EXCAVATION METHOD: JOHN DEERE 60G W/ 32" BUCKET <br />NOTES: <br />EXPLORATORY TEST PITS <br />CAPITAL HILL PUD EUGENE, OREGON <br />~ anch <br />GINEERING.- CAPITAL DRIVE EUGENE, OREGON SEPTEMBER 30, 2016 <br />St= I", PROJECT NO. 14-020 <br />310 5th Street, Springfield OR 97477 1 p: 541.746.0637 1 www.branchengineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.