Contents <br />Page No. <br />1.0 <br />EXECUTIVE SUMMARY <br />1 <br />1.1 <br />Project Description <br />1 <br />1.2 <br />Traffic <br />1 <br />1.3 <br />Operational Safety <br />1 <br />1.4 <br />Results <br />1 <br />2.0 <br />INTRODUCTION <br />2 <br />2.1 <br />Existing Conditions <br />2 <br />2.1.1 <br />Background <br />2 <br />2.1.2 <br />Capital Drive <br />2 <br />2.1.3 <br />Sight Distance <br />4 <br />2.1.4 <br />Existing Traffic Speeds and Volumes <br />6 <br />2.1.5 <br />Roadway and Intersection Crash History <br />7 <br />3.0 <br />DEVELOPMENT AND TRAFFIC CONDITIONS <br />7 <br />3.1 <br />Land Use <br />7 <br />3.2 <br />Development Level Traffic Volumes and Impacts <br />8 <br />3.3 <br />Pedestrian and Motor Vehicle Accommodations <br />8 <br />3.4 <br />Street Connectivity <br />9 <br />4.0 Conclusion and Recommendations <br />LIST OF APPENDICES <br />Appendix A: Street Design Guidelines <br />Appendix B: Figures <br />Appendix C: Collected Traffic Data <br />Appendix D: ODOT Crash Data <br />Appendix E: Site Plan <br />.....................12 <br />