My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPLICATION MATERIALS
>
OnTrack
>
PDT
>
2017
>
PDT 17-1
>
APPLICATION MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 4:04:22 PM
Creation date
3/7/2017 10:01:45 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
17
File Sequence Number
1
Application Name
CAPITAL HILL PUD
Document Type
Application Materials
Document_Date
3/3/2017
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Hill PUD Page 36 of 63 <br />Planned Unit Development Application - Tentative Stage - Written Statement <br />March 3. 2017 <br />property condition. The streets shall be in locations that will enable adjoining properties to <br />connect to the proposed development's street system. <br />Capital Drive currently exists as a 50' wide dedicated public right-of-way that extends north <br />to the place where it abuts into the south property line of Hendricks Park. Although it might <br />appear in map view that a connection could be made at the terminus of Capital Drive at <br />Hendricks Park to the terminus of Highland Drive, it would require installing a road across <br />park property and on a slope of over 30%. (see attached Traffic Safety Study) <br />The only proposed street is a private drive that loops through the property, connecting in 2 <br />places with Capital Drive. <br />To the north is Hendricks Park. Capital Drive already abuts that property. To the south and <br />west are fully developed properties and a network of roads. To the east is undeveloped <br />and/or partially developed property. The Ribbon Trail abuts the east property line (see <br />Attachment I) of the development. There are also developed/partially <br />developed/unannexed lots east of the Ribbon Trail. The east portion of the subject <br />property, the entire Ribbon Trail lot, and the properties east of the Ribbon Trail contain <br />steeps slopes that are unsuitable to provide a connection between the private drive on the <br />subject property and Floral Hill Drive. The road would exceed the Fire Code standards for <br />allowable slopes. In addition, it is unlikely that a connecting road would be allowed through <br />the Ribbon Trail property. Therefore, no connection to Floral Hill Drive from the subject <br />property is proposed. <br />(d) Secondary access for fire and emergency medical vehicles consistent with EC 9.6870 <br />I believe this is supposed to refer to EC 9.6820 Cul-de-Sacs'or Emergency Vehicle <br />Turnarounds. <br />Capital Drive is at the top of a hill and abuts City of Eugene Parks and Open Space <br />Department property. This leaves no possible or practical reason for connecting streets to <br />go through these properties. <br />Access to the development is provided from Capital Drive and from Cresta de Ruta Street. <br />Originally a secondary access connection was proposed from the private drive across Lots <br />17,18,19 and 20, providing a connection further south on Capital Drive. Geotechnical <br />studies revealed a slide area between Lots 18 and 19 and civil engineer recommendations <br />suggested the area was too steep to properly accommodate a road with excessive grading, <br />retaining walls, and potential slide hazard. Therefore, that secondary road was abandoned, <br />a decision that was discussed with both Public Works staff and Fire Department staff. <br />All new units developed on the subject property will be sprinklered, which is an option <br />typically supported by Fire Department staff when secondary access is not available. This <br />aspect can be reviewed at time of building permit. <br />(e) Except for applications proposing needed housing, all applicants shall show that the <br />proposed street alignment shall minimize excavation and embankment and avoid impacts <br />to natural resources, including water related features. <br />The proposed improvements to Capital Drive are to be constructed within the existing <br />dedicated public right-of-way. The majority of the improvements are proposed either to the <br />east or uphill side of the street. Along the east boundary of Capital Drive, the topography is <br />fairly even and somewhat flat in places. <br />Street A its proposed as a private drive, which minimizes impacts to the site. The plan view <br />footprint of the proposed drive is 25 feet (21' of pavement and 4' of sidewalk on one side). <br />This is a context-appropriate road that is located approximately in the footprint of an <br />unofficial drive that was created by prior owners of the property. This portion of the site was <br />used for vehicular access to the site and was logically created on relatively flat ground. <br />Schirmer Satre Group 9 375 West 4 m Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.