L- <br />MAR - 3 2017 <br />i <br />CAPITAL HILL PU D <br />TRAFFIC SAFETY <br />AND STREET CONNECTIVITY STUDY <br />Eugene, Oregon <br />BEI Project 14-020 <br />Prepared for: <br />Carol Schirmer <br />Schirmer Satre Group <br />375 W. 4t" Ave, Suite 201 <br />Eugene, OR 97401 <br />March 3, 2017 <br />GINEERING.= <br />Since 1977 <br />civil • transportation <br />structural • geotechnical <br />S U R V E Y I N G <br />www.BranchEngineering.com <br />310 5th Street <br />Springfield, OR 97477 <br />p: 541.746.0637 <br />f: 541.746.0389 <br />