approved infiltration or filtration facility cannot be located on the <br />development site without reducing the size of the proposed <br />development which is otherwise consistent with all other <br />applicable lot and development standards. <br />(e) The selected stormwater quality facilities shall treat all stormwater runoff <br />from all new or replaced impervious surface areas, or an equivalent on- <br />site area, that will result from the water quality design storm except that <br />the selected the stormwater quality facility does not need to treat the <br />stormwater runoff from new or replaced impervious surface that is 500 <br />sq. feet or less and does not gravity-feed into the selected treatment <br />facility. <br />(f) All stormwater quality facilities shall be sited, designed and constructed <br />according to the water quality provisions and the facility design <br />requirements set forth in the Stormwater Management Manual. <br />(g) The standards in EC 9.6792(3) may be adjusted pursuant to EC <br />9.8030(24). <br />(Section 9.6792 added by Ordinance No. 20369, enacted June 14, 2006, effective July 14, <br />2006; amended by Ordinance No. 20521, enacted January 13, 2014, effective March 1, 2014.) <br />