Eugene Code -DRAFT- Application Requirements and Criteria <br />(b) Prior acceptance by the appropriate public agency of a written <br />commitment by the applicant or other parry to provide private services and <br />facilities.. <br />(c) A written commitment by the applicant or other party to provide for <br />offsetting all added public costs or early commitment of public funds <br />made necessary by development, submitted on a form acceptable to the <br />city manager. <br />(9) All proposed dwellings within the PUD are within 1/4 mile of an accessible <br />recreation area or open space that is at least one acre in size and will be <br />available to residents. <br />(10) Stormwater runoff from the PUD will not create negative impacts on natural <br />drainage courses either on-site or downstream, including, but not limited to, <br />erosion, scouring, turbidity, or transport of sediment due to increased peak flows <br />or velocity. <br />(11) Lots proposed for development with one-family detached dwellings shall <br />comply with EC 9.2780 Solar Lot Standards (these standards may be modified <br />as set forth in subsection (12) below). <br />(12) The PUD complies with all applicable development standards explicitly <br />addressed in the application except where the applicant has shown that a <br />modification is consistent with the purposes as set out in EC 9.8300 Purpose of <br />Planned Unit Development. <br />9.8330 Site Alteration. Unless specifically permitted by the hearings official, vegetation, <br />topography, and other natural features of areas proposed for a PUD shall not be <br />substantially altered until final PUD approval, and then, only as authorized by the <br />final PUD approval. Substantially altered includes, but is not limited to, site grading <br />and removal of trees or other vegetation. If a subdivision is required, site alteration <br />shall not be permitted until after tentative subdivision approval is granted. <br />Planned Unit Development, Final Plan <br />9.8350 Purpose of Planned Unit Developments, Final Plan. The PUD process includes <br />both a tentative and final plan. Final plan approval is required primarily to ensure that <br />tentative plan approval conditions have been met. <br />9.8355 Applicability. A final PUD plan is required for every approved tentative PUD, and <br />every phase of a tentative PUD. <br />9.8360 Planned Unit Development, Final Plan Application Requirements. In addition to <br />the provisions in EC 9.7010 Application Filing, the following specific requirements <br />apply to PUD final plan applications: <br />(1) Applications shall contain final maps and supplemental materials required to <br />demonstrate compliance with tentative plan conditions of approval. <br />(2) Final PUD plans may be submitted in phases, if such phases were approved as <br />part of the tentative PUD consideration. The boundaries of each phase of the <br />DRAFT 9.8-19 0 0 0 0 7 4S 99 <br />