My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04 Public Record Pages 613-823
>
OnTrack
>
Z
>
2015
>
Z 15-5
>
04 Public Record Pages 613-823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2015 4:29:15 PM
Creation date
10/23/2015 1:30:37 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
Z
File Year
15
File Sequence Number
5
Application Name
LAUREL RIDGE
Document Type
Misc.
Document_Date
10/23/2015
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBITS Page 126 <br />facilities. As required by Goal 11, the Public Facilities and Services Plan identifies and shows <br />the general location15of the water, wastewater, and stormwater projects needed to serve land <br />within the UGB.16 The Public Facilities and Services Plan also contains this information for <br />electrical facilities, although not required to by law. <br />The project lists and maps in the Public Facilities and Services Plan are adopted as part of the <br />Metro Plan. Information in the Public Facilities and Services Plan on project phasing and costs, <br />and decisions on timing and financing of projects are not part of the Metro Plan and are <br />controlled solely by the capital improvement programming and budget processes of individual <br />service providers. <br />The policies listed provide direction for public and private developmental and program decision- <br />making regarding urban facilities and services. Development should be coordinated with the <br />planning, financing, and construction of key urban facilities and services to ensure the efficient <br />use and expansion of these facilities. <br />Goals <br />Provide and maintain public facilities and services in an efficient and environmentally <br />responsible manner. <br />2. Provide public facilities and services in a manner that encourages orderly and sequential <br />growth. <br />Findings and Policies <br />The findings and policies in this element are organized by the following four topics related to the <br />provision of urban facilities and services. Policy direction for the full range of urban facilities <br />and services, may be found under any of these topics, although the first topic, Services to <br />Development Within the Urban Growth Boundary, is further broken down into sub-categories. <br />Services to Development Within the Urban Growth Boundary <br />• Planning and Coordination <br />• Water <br />• Stormwater <br />• Wastewater Treatment <br />• Electricity <br />• Schools <br />• Solid Waste Treatment <br />• Services to Areas Outside the Urban Growth Boundary <br />• Locating and Managing Public Facilities Outside the Urban Growth Boundary <br />15 The exact location of the projects shown on the Public Facilities and Services Plan planned facilities maps is <br />determined through local processes. <br />16 Goal 11 also requires transportation facilities to be included in public facilities plans. In this metropolitan area, <br />transportation facilities are addressed in Metro Plan Chapter III-F and in the Eugene-Springfield Transportation <br />System Plan (Trans Plan). <br />Laurel Ridge Record (Z 15-5) Page 689 <br />
The URL can be used to link to this page
Your browser does not support the video tag.