My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 Public Record Pages 413-612
>
OnTrack
>
Z
>
2015
>
Z 15-5
>
03 Public Record Pages 413-612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2015 4:23:18 PM
Creation date
10/23/2015 1:30:12 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
Z
File Year
15
File Sequence Number
5
Application Name
LAUREL RIDGE
Document Type
Misc.
Document_Date
10/23/2015
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBITS Page 34 <br />The district or zone of benefit will contract with the appropriate city for interim <br />service delivery until annexed to the appropriate city. <br />Ultimately, land within the UGB shall be annexed to a city and provided with the <br />required minimum level of urban facilities and services. While the time frame for <br />annexation may vary, annexation should occur as land transitions from urbanizable to <br />urban. <br />Eugene and Springfield and their respective utility branches, Eugene Water & Electric <br />Board (EWEB) and Springfield Utility Board (SUB), shall be the water and electrical <br />service providers within the UGB. <br />As annexations to cities occur over time, existing special service districts within the UGB <br />shall be dissolved. The cities should consider developing intergovernmental agreements, <br />which address transition issues raised by annexation, with affected special service <br />districts. <br />The realignment (possible consolidation or merger) of fringe special service districts shall <br />be examined to: <br />a. Promote urban service transition to cities within the UGB. <br />b. Provide continued and comprehensive rural level services to property and people <br />outside the UGB. <br />Provide more efficient service delivery and more efficient governmental structure <br />for serving the immediate urban fringe. <br />Annexation of territory to existing service districts within the UGB shall occur only when <br />the following criteria are met: <br />a. Immediate annexation to a city is not possible because the required minimum <br />level of key urban facilities and services cannot be provided in a timely manner <br />(within five years, as outlined in an adopted capital improvements program); <br />b. Except for areas that have no fire protection, affected property owners have <br />signed consent to annex agreements with the applicable city consistent with <br />Oregon annexation law. <br />Such annexations shall be considered as interim service delivery solutions until ultimate <br />annexation to a city occurs. <br />When unincorporated territory within the UGB is provided with any new urban service, <br />that service shall be provided by the following method (in priority order). <br />Annexation to a city; <br />Laurel Ridge Record (Z 15-5) Page 597 <br />
The URL can be used to link to this page
Your browser does not support the video tag.