My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01 Public Record Pages 1-204
>
OnTrack
>
Z
>
2015
>
Z 15-5
>
01 Public Record Pages 1-204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2015 4:08:06 PM
Creation date
10/23/2015 1:24:44 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
Z
File Year
15
File Sequence Number
5
Application Name
LAUREL RIDGE
Document Type
Misc.
Document_Date
10/23/2015
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Except for areas that have. no fire protection, affected property owners have <br />signed consent to annex agreements with the applicable city whie m°°' <br />"triple ' consistent with Oregon annexation law. <br />Such annexations shall be considered as interim service delivery solutions until ultimate <br />annexation to a city occurs, <br />21. When unincorporated territory within the UGB is provided with any new urban service, <br />that service shall be provided by the following method (in priority order). <br />a. Annexation to a city; <br />b. Contractual annexation agreements with a city; <br />C. Annexation to an existing district (under conditions described previously in Policy <br />#192.O j; or <br />d. Creation of a new service district (under conditions described previously in Policy <br />#44j5). <br />22. Cities shall not extend water or s-amitafy sewer-wastewater service outside city limits to <br />serve a residence or business without first obtaining a valid "triple " annexation <br />petition, a consent to annex agreement, or when a health hazard annexation is required. <br />23. Regulatory and fiscal incentives that direct the geographic allocation of growth and <br />density according to adopted plans and policies shall be examined and, when practical, <br />adopted. <br />24. To accomplish the Fundamental Principle of compact urban growth addressed in the text <br />and on the Metro Plan Diagram, overall metropolitan-wide density of new residential <br />construction, but not necessarily each project, shall average approximately six dwelling <br />units per gross acre over the planning period. <br />25. When conducting metropolitan planning studies, particularly the Pubic Facilities and <br />Services Plan and 41ternat4,e Gyewth Areas , consider the orderly provision and <br />financing of public services and the overall impact on population and geographical <br />growth in the metropolitan area. Where appropriate, fixture planning studies should <br />include specific analysis of the growth impacts suggested by that particular study for the <br />metropolitan area. <br />26. Based upon direction provided in Policies 34, -7$, and 2-324 of this section, any <br />development taking place in an urbanizable area ev in ' --sidential designations in an <br />ufba --@- e afe shall be designed to the development standards of the city which <br />would be responsible for eventually providing a minimum level of key urban services to <br />the area. Unless the following conditions are met, the minimum lot size for campus <br />industrial designated areas shall be 50 acres and the minimum lot size for all other <br />II-C-7 <br />Laurel Ridge Record (Z 15-5) Page 135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.