solution <br />(permeability) that <br />doesn't create dust - <br />please refer to "West <br />Property Line" <br />documents in the <br />"Oakleigh Cohousing" <br />Dropboxforfurther <br />details. This method <br />has been tried and <br />trued at other <br />Cohousing <br />Communities to great <br />success. <br />(2) Drainage <br />See details at EC <br />Yes <br />9.6790 <br />(3)Landscaping <br />L-3 along west <br />No <br />property line 7 feet <br />Response: Due to the <br />wide <br />nature of our proposal - <br />which is building <br />L-2 between parking <br />garages and block wall <br />along north property <br />(almost) right up to the <br />line <br />West Property Line (see <br />"West Property Line" <br />documents) there's <br />subsequently not a 7' <br />wide swath of L-3 <br />Landscaping there along <br />West Prop Line. We're <br />proposing a "green <br />wall" that will have <br />espaliered plants <br />growing up the nice- <br />looking, fire-proof CMU <br />wall with colored parge <br />coat (this is much better <br />than your standard of <br />rickety fence). <br />As for the required L-2 <br />along North Prop Line, <br />it's actually there on the <br />Landscape Plan - please <br />refer to OMC <br />1477 <br />