every 25 feet of <br />recessed entry <br />vertical surface <br />portals. <br />(8) Site Landscaping <br />20% of 2.3 acres = <br />? <br />Yes <br />Minimum amount <br />20,037 sf open space <br />equal to open space <br />required with 4007 sf <br />specified in EC <br />of landscaping <br />9.5500(9), 20% of <br />which is living plant <br />material <br />(9) Open Space <br />20% of 2.3 acres = <br />? <br />Yes <br />20% of development <br />20,037 sf open space <br />site or 15% livable <br />required <br />floor area, whichever <br />is greater (25% credit <br />for developments <br />within one-quarter <br />mile of a public park) <br />(10) Block <br />N/A <br />Requirements <br />(11) Site Access <br />Development sites <br />No Alley <br />N/A <br />with alley access shall <br />use the alley to <br />provide access to the <br />development site <br />(12) Vehicle Parking <br />Parking garages shall <br />No portion of the <br />Yes <br />not extend across <br />parking garage abuts <br />more than 50% of any <br />the street frontages <br />street frontage <br />(13) On-Site <br />Direct access <br />Paved pedestrian <br />Yes <br />Pedestrian <br />between building <br />ways from building <br />Circulation <br />entrances and public <br />entrances to abutting <br />ways <br />streets and alley <br />(14) Recycling and <br />Covered and enclosed <br />Need to address <br />Garbage Areas <br />on three sides <br />Response: <br />Same as EC 9.5650 <br />Our "Temple to <br />and EC 9.6740 <br />Recycling" has been <br />fully detailed, and is <br />covered and enclosed <br />on FOUR sides - <br />1475 <br />