My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-28-15 Trautman Public Comment (06)
>
OnTrack
>
PDT
>
2013
>
PDT 13-1
>
7-28-15 Trautman Public Comment (06)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 4:32:34 PM
Creation date
7/28/2015 2:42:48 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
13
File Sequence Number
1
Application Name
OAKLEIGH COHOUSING
Document Type
Public Comments
Document_Date
7/28/2015
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Pollution Reduction-Calculation Results <br />Peak Flow Rate to Stormwater Facility = 0.014 cfs <br />Peak Facility Overflow Rate= 0.000 cfs <br />Total Runoff Volume to Stormwater <br />Facility = 182 cf <br />Total Overflow Volume= 0 cf <br />Max. Depth of Stormwater in Facility= 1.6 in <br />Drawdown Time= 0.2 hours <br />Yes Facility Sizing Meets Pollution Reduction Standards? <br />YES Meets Requirement of No Facility Flooding? <br />YES Meets Requirement for Maximum of 18 Hour Drawdown Time? <br />Flow Control-Calculation Results <br />Peak Flow Rate to Stormwater Facility = 0.040 cis <br />Peak Facility Overflow Rate= 0.013 cfs <br />Total Runoff Volume to Stormwater <br />Facility = 519 cf <br />Total Overflow Volume= 18 cf <br />Peak Off-Site Flow Rate <br />Max. Depth of Stormwater in Facility= 6.0 in <br />Filtration Facility Underdrain= 0.010 cfs <br />Drawdown Time= 0.2 hours <br />Pro-Development Runoff Data <br />Peak Flow Rate T-70. 0 2 2cfs <br />Total Runoff Volume = 325 cf <br />Yes Facility Sizing Meets Flow Control Standards? <br />YES Meets Requirement for Post Development offs ite flow less or equal to Pre-Development Flow? <br />YES Meets Requirement for Maximum of 18 Hour Drawdown Time? <br />Destination-Calculation Results <br />Peak Flow Rate to Stormwater Facility = cfs <br />Peak Facility Overflow Rate= cfs <br />Total Runoff Volume to Stormwater <br />Facility = cf <br />Total Overflow Volume= cr <br />Max. Depth of Stormwater In Facility= in <br />M <br />Drawdown Time= <br />hours <br />Facility Sizing Meets Destination Standards? <br />Meets Requirement of No Facility Flooding? <br />Meets Requirement for Maximum of 30 hour Drawdown Time? <br />1412 <br />3111/2013-10:5 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.