My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7-28-15 Trautman Public Comment (05)
>
OnTrack
>
PDT
>
2013
>
PDT 13-1
>
7-28-15 Trautman Public Comment (05)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 4:32:34 PM
Creation date
7/28/2015 2:35:01 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
13
File Sequence Number
1
Application Name
OAKLEIGH COHOUSING
Document Type
Public Comments
Document_Date
7/28/2015
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
' PH-33 <br />TAYLOR Becky G <br />To: TAYLOR.Becky G <br />Subject: Solal Setback <br />Attachments: OMC_Dist Ridge to N PLJPG <br />BWAlreadyEdited: Yes <br />BWMessageAction: Forward <br />SSB = (2.5 x SP_H) + (N divided by 2) - 82.5 <br />Note: since roof slope is less than 5/12, SPH (Solar Point Ht) is height to eave = 19'-2" <br />Note: N = North - South Lot Dimension-(max is 90') SSB = (2.5 x 19.167) + (90 / 2) - 82.5 SSB = (47.9175) + (45) - <br />82.5 SSB =10.4175 Feet <br />'I <br />So, the distance from the ridge to the North Property Line needs to be at least 10.4 feet, and we're at 42'-6" at the <br />nearest at Building 41 (please see attached). And Bldg#2 is in the clear as per,this formula, but it's also fronting the huge <br />cedar trees and the neighbor's vacant lot. <br />1279 <br />
The URL can be used to link to this page
Your browser does not support the video tag.