Attachments: <br />AttachmentA:Vicinity Map <br />Attachment B: Right-of-Way Dedications <br />Attachment C: Bicycle/Pedestrian Connections <br />Attachment D: Reduced Excerpts Application Materials <br />D-1 Topography map by Poage Engineering <br />D-2 Site Plan A1.1 <br />D-3 Detail of north property line setbacks <br />D-4 Tree Preservation and Removal Plan <br />D-5 Figure 1 Street Connectivity Study by Access Engineering <br />All record materials are available for review at the Planning Division. Copies or emails of these <br />additional materials can be provided upon request. The Hearings Official will be provided a full set of <br />the applicant's materials for review, and the full application file will be made available at the public <br />hearing. <br />For More Information: <br />Please contact Becky Taylor, Assistant Planner, Eugene Planning Division, by phone at (541) 682-5437, <br />or by e-mail, at becky.g.taylor@ci.eugene.or.us <br />Staff Report: Oakleigh Meadows Cohousing September 2013 Page 40 <br />HO Agenda - Page 47 <br />1027 <br />