OMC is proposing Filtration Rain Gardens and Vegetated Swales for stormwater <br />destinations, and the City of Eugene has verified that the proposed facility meets <br />requirements of no facility flooding and the maximum of 18 hour drawdown times. <br />Furthermore, our proposed facility meets the flow control standards requiring that the <br />post development offsite flow be less or equal to pre-development flow. This has also <br />been addressed by Neil Bjorklund, the Parks and Open Space Planning Manager, in his <br />letter on record addressed July 11 tb, 2013. <br />Sincerely, <br />Willard C. Dixon, AIA <br />OMC Project Manager <br />Principal, Willard C. Dixon Architect, LLC <br />2013 AJA-Southwestem Oregon President <br />613 <br />