3C>A-?- <br />Pollution Reduction-Calculation Results . <br />Peak Flow Rate to Stormwater Facility = 0.012 cfs . <br />Peak Facility Overflow Rate= 0.000 cfs <br />Total Runoff Volume to Stormwater <br />Facility = 156 cf <br />Total Overflow Volume= 0 Cf <br />Max. Depth of Stormwater in Facility= .1.6 in <br />Drawdown Time= 0.2 hours <br />Yes Facility Sizing Meets Pollution Reduction Standards? <br />YES. Meets Requirement of No Facility Flooding? <br />YES Meets Requirement for Maximum of 18 Hour Drawdown Time? <br />Flow Control-Calculation Results <br />Peak Flow Rate to Stormwater Facility = 0.034 cfs <br />Peak Facility Overflow Rate= 0.014 cfs <br />Total Runoff Volume to Stormwater <br />Facility = 446 cf <br />Total Overflow Volume= 19 Cf <br />Peak Off-Site Flow Rate <br />Max. Depth of Stormwater in Facility= 6.0 in <br />Filtration Facility Underdrain= 0.009 cfs <br />Drawdown Time= 0.2 hours <br />Pre-Development Runoff Data <br />Peak Flow Rate = 0.019 cfs <br />Total Runoff Volume = 279 cf <br />Yes Facility Sizing Meets Flow Control Standards? <br />YES Meets Requirement for Post Development offsite flow lessor equal to Pre-Development Flow? <br />YES Meets Requirement for Maximum of 18 Hour Drawdown Time? <br />Destination-Calculation Results. <br />Peak Flow Rate to Stormwater Facility = cfs <br />Peak Facility Overflow Rate= cfs <br />Total Runoff Volume to Stormwater <br />Facility = cf <br />Total Overflow Volume= cf <br />Max. Depth of Stormwater in Facility= in <br />Drawdown Time= hours <br />Facility Sizing Meets Destination Standards? <br />Meets Requirement of No Facility Flooding? <br />Meets Requirement for Maximum of 30 hour Drawdown Time? <br />6 01 112013'10:57 AM <br />