My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ATT New Evidence Submitted During First Open Record Period
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
ATT New Evidence Submitted During First Open Record Period
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2015 4:11:17 PM
Creation date
6/18/2015 10:30:06 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
ATT AT CROSSFIRE
Document Type
Public Comments submitted after hearings official hearing
Document_Date
6/17/2015
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
lease site if needed in accordance with Eugene Water and Electric Board (EWEB) policies and <br />procedures. This criterion is met. <br />EC 9.6505(2) Sewage. <br />This standard requires all developments to be served by wastewater sewage systems of the City, in <br />compliance with the provisions of EC Chapter 6. Even though the proposed cell tower and equipment <br />shelter do not require wastewater facilities, the proposed development has access to facilities that <br />comply with this requirement as a private lateral has been extended to Tax Lot 4200 from the public <br />manhole 8708) in Law Lane. <br />EC 9.6505(3) Streets and Alleys. <br />There is no requirement for a public street as a result of this development. <br />EC 9.6505(4) Sidewalks. <br />There is no requirement for a public sidewalk as a result of this development. <br />EC 9.6505(5) Bicycle Paths and Accessways. <br />No bicycle paths or public access ways are required per the previous findings at EC 9.6835, which are <br />incorporated by reference. <br />(c) EC 9.6735 Public Access Required <br />(1) Except as otherwise provided in this land use code, no building or structure <br />shall be erected or altered except on a lot fronting or abutting on a public street <br />or having access to a public street over a private stree# or easement of record <br />approved in accordance with provisions contained in this land use code. <br />The proposed facility complies with this standard as the signed option and lease agreement <br />(Applicant's Exhibit A) provides for unrestricted access to the nearest public right-of-way (i.e. Cal <br />Young Road). <br />(2) Access from a public street to a development site shall be located in <br />accordance with EC 7.420 Access Connections - Location. If a development will <br />increase the development site's peak hour trip generation by less than 50% and <br />will generate less than 20 additional peak hour trips, the development site's <br />existing access connections are exempt from this standard. <br />With an anticipated increase in traffic of one visit per month, the existing connection to Cal Young <br />Road'is exempt from this standard. <br />Staff Report <br />(PDT 10-2 & CU 11-1) June 2011 37 <br />HO Agenda - Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.