My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ATT New Evidence Submitted During First Open Record Period
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
ATT New Evidence Submitted During First Open Record Period
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2015 4:11:17 PM
Creation date
6/18/2015 10:30:06 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
ATT AT CROSSFIRE
Document Type
Public Comments submitted after hearings official hearing
Document_Date
6/17/2015
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
June 16, 2015 <br />Page 3 <br />collocated on an existing structure. "(Emphasis added). <br />AT&T has demonstrated that the height of the proposed facility at the Crossfire Church <br />cannot be obtained on an existing utility pole, even with a permitted pole extension. <br />AT&T is providing in the attached Exhibit A the technical data requested for the <br />proposed site, which provides sufficient information for CMS to verify that this facility, <br />as proposed, cannot be placed on an existing utility pole or structure. It should be <br />noted that the CMS comments on this code provision in its second report focus only on <br />potential use of multiple structures at lower heights and structurally modifying facilities <br />outside the 2000 foot radius. This is clearly not required by the Eugene code, as <br />interpreted by LUBA in the Johnson case. <br />Sincerely, <br />Kim Allen <br />Attorneys for Applicant AT&T <br />
The URL can be used to link to this page
Your browser does not support the video tag.