10 <br />- 14 <br />6 <br />J III I~~'r- 9 <br />o a) n <br />12 <br />i <br />j <br />~T f n <br />U PROPOSED 16'X16' CEDAR FENCE <br />O PROPOSED MONOPINE BRANCHES <br />O PROPOSED MONOPINE <br />O PROPOSED ANTENNA MOUNTS (3 TOTAL) <br />O PROPOSED ANTENNAS (2 PER SECTO <br />10 PROPOSED RRH (4 PER SECTOR, 12 TOTAL <br />11 PROPOSED SURGE SUPPRESSOR (2 TOTAI <br />12 PROPOSED MICROWAVE ANTENNA <br />13 FUTURE ANTENNAS BY OTHER CARRIER <br />14 FUTURE MICROWAVE ANTENNA BY OTHEF <br />15 PROPOSED AT&T GPS/E-911 DOWNLINK At <br />NOTES <br />1. STRUCTURAL ANALYSIS MUST BE PERFORME <br />FLAGPOLES AND TOWER SITES BEFORE INST <br />RRHS, AND CABINETS. REFER TO STRUCTURE <br />CONTRACTOR SHALL REFER TO STRUCTURA <br />ADDITIONAL LOADS. NO ERECTION OF MODIF <br />SHALL BE MADE WITHOUT APPROVAL OF STF <br />2. FIELD VERIFY EXISTING AZIMUTH BEFORE RE <br />IF REQUIRED. PRIOR APPROVAL FROM AT&T" <br />RELOCATION OF ANTENNAS. <br />3. ALL AZIMUTHS ARE TO BE ESTABLISHED CLO <br />NORTH HEADING. CONTRACTOR SHALL VERI <br />RAD CENTER AND ORIENTATIONS WITH AT&T <br />OF ANTENNAS. <br />