'PUBLIC AUTHORITY REGARDING THE <br />o ...nco „v nrv ~ v,rvic,vo,~rv ~n v i ncn iv,i. i cnihc i n.,, rv,n, rv,nr.c , nc <br />INORGANIC MATERIAL UNSUITABLE FOR BACKFILL <br />i.D UTILITY COMPANY SPECIFICATIONS AND <br />2.4 SELECT STRUCTURAL FILL: GRANULAR FILL MATERIAL MEETING THE REQUIREMENTS OF ASTM E850-95, FOR USE AROUND <br />UNDER STRUCTURES WHERE STRUCTURAL FILL MATERIAL ARE REQUIRED. <br />IUIPMENT, APPURTENANCES, AND LABOR <br />2.5 GRANULAR BEDDING AND TRENCH BACKFILL: WELL - GRADED SAND MEETING THE GRADATION REQUIREMENTS OF ASTM <br />4GS. <br />D2487 (SE OR SW-SM), <br />,MMATIC OUTLINE ONLY UNLESS <br />2.6 COARSE AGGREGATE FOR ACCESS ROAD SUB-BASE COURSE SHALL CONFORM ASTM D2940. <br />3S OTHERWISE NOTED. SPACING BETWEEN <br />2.7 UNSUITABLE MATERIAL: HIGH AND MODERATELY PLASTIC SILTS AND CLAYS (LL>45). MATERIAL CONTAINING REFUSE, FROZEN <br />:Al_ TO FIELD VERIFY DIMENSIONS, SHOULD <br />LUMPS, DEMOLISHED BITUMINOUS MATERIAL, VEGETATIVE MATTER, WOOD, STONES IN EXCESS OF 31NCHES IN ANY <br />BCONTRACTOR SHALL BE RESPONSIBLE <br />DIMENSIONS AND DEBRIS AS DETERMINED BY THE CONSTRUCTION MANAGER. TYPICALLY WILL BE SOILS CLASSIFIED BY ASTM <br />) PROCEEDING WITH THE WORK. DETAILS <br />AS PT, MH, CH, OH, ML, AND OL. <br />D TO SUIT JOB DIMENSIONS OR CONDITIONS <br />2.8 GEOTEXTILE FABRIC: MIRAFI 500X OR APPROVED EQUAL. <br />AIRED BY THE ARCHITECT / ENGINEER <br />2.9 PLASTIC MARKING TAPE: SHALL BE ACID AND ALKALI RESISTANT POLYETHYLENE FILM SPECIFICALLY MANUFACTURED FOR <br />MARKING THE LOCATING UNDERGROUND UTILITIES 61NCHES WIDE WITH A MINIMUM THICKNESS OF 0.004 INCHES. TAPE SHALL <br />CORDANCE WITH MANUFACTURER'S <br />HAVE MINIMUM STRENGTH OF 1500 PSI IN BOTH DIRECTIONS AND MANUFACTURED WITH INTEGRAL CONDUCTORS, FOIL <br />BACKING OR OTHER MEANS TO ENABLE DETECTION BY A METAL DETECTOR WHEN BURIED UP TO 3 FEET DEEP. THE METALLIC <br />RAW INGS, THE SUBCONTRACTOR SHALL <br />CORE OF THE TAPE SHALL BE ENCASED IN A PROTECTIVE JACKET OR PROVIDED WITH OTHER MEANS TO PROTECT IT FROM <br />4EER PRIOR TO PROCEEDING. <br />CORROSION. TAPE COLOR SHALL BE RED FOR ELECTRIC UTILITIES AND ORANGE FOR TELECOMMUNICATION UTILITIES. <br />AREA, ADJACENT AREAS AND BUILDING <br />PART 3 - EXECUTION <br />DNTRACT. WORK SHALL CONFORM TO ALL <br />3.1 GENERAL: <br />A. BEFORE START GENERAL SITE PREPARATION ACTIVITIES, INSTALL EROSION AND SEDIMENT CONTROL, MEASURES. THE <br />;TIVITIES WITH OTHER DISCIPLES. <br />WORK AREA SHALL BE CONSTRUCTED AND MAINTAINED IN SUCH CONDITION THAT IN THE EVENT OF RAIN THE SITE WILL BE <br />:RIENCED WORKMAN IN ACCORDANCE WITH <br />DRAINED AT ANY TIME. <br />-L BE LAID PLUMB AND TRUE AS INDICATED <br />B. BEFORE ALL SURVEY, LAYOUT, STAKING, AND MARKING, ESTABLISH AND MAINTAIN ALL LINE, GRADES, ELEVATIONS AND <br />BENCHMARKS NEEDED FOR EXECUTION OF THE WORK. <br />LS APPROVED BY LOCAL JURISDICTION. <br />C. CLEAR AND GRUB THE AREA WITHIN THE LIMITS OF THE SITE. REMOVE TREES, BRUSH, STUMPS, RUBBISH, OTHER DEBRIS, <br />ALL DEBRIS. <br />AND VEGETATION RESTING ON OR PROTRUDING THROUGH THE SURFACE OF THE SITE AREA TO BE CLEARED. <br />VD NOTES. THE SCOPE OF WORK FOR THIS <br />1. REMOVE THE FOLLOWING MATERIALS TO A DEPTH OF NO LESS THAT 12 INCHES BELOW THE ORIGINAL GROUND <br />CTOR SHALL NOTIFY THE GENERAL <br />SURFACE: ROOTS, STUMPS, AND OTHER DEBRIS, BRUSH AND REFUSE EMBEDDED IN OR PROTRUDING THROUGH <br />ING PRIOR TO THE BEGINNING <br />THE GROUND SURFACE, RAKE, DISK, OR PLOW THE AREA TO A DEPTH OF NO LESS THAN 6 INCHES, AND REMOVE TO <br />A DEPTH OF 12 INCHES ALL ROOTS AND OTHER DEBRIS THEREBY EXPOSED. <br />MANAGER 48 HOURS PRIOR TO <br />2. REMOVE TOPSOIL MATERIAL COMPLETELY FROM THE SURFACE UNTIL THE SOIL NO LONGER MEETS THE DEFINITION <br />OF TOPSOIL. AVOID MIXING TOPSOIL WITH SUBSOIL OR OTHER UNDESIRABLE MATERIALS. <br />TS, CURBS, LANDSCAPING AND <br />3. EXCEPT WHERE EXCAVATION TO GREATER DEPTH IS INDICATED TILL DEPRESSIONS RESULTING FROM CLEARING, <br />,TOR'S EXPENSE TO THE SATISFACTION OF <br />GRUBBING, AND DEMOLITION WORK COMPLETELY WITH SUITABLE FILL. <br />D. REMOVE FROM THE SITE AND DISPOSE IN AN AUTHORIZED LANDFILL ALL DEBRIS RESULTING FROM CLEARING AND <br />"0 THE START OF CONSTRUCTION. <br />GRUBBING OPERATIONS. BURNING WILL NOT BE PERMITTED. <br />TRADES AND SUBCONTRACTORS TO THE <br />E. PRIOR TO EXCAVATING, THOROUGHLY EXAMINE THE AREA TO BE EXCAVATED AND / OR TRENCHED TO VERIFY THE <br />LOCATIONS OF FEATURES ON THE DRAWINGS AND TO ASCERTAIN THE EXISTENCE AND LOCATION OF ANY STRUCTURE, <br />SITE FOR THE DURATION OF <br />UNDERGROUND STRUCTURE, OR OTHER ITEM THAT MIGHT INTERFERE WITH THE PROPOSED CONSTRUCTION. NOTIFY THE <br />CONSTRUCTION MANAGER OF ANY OBSTRUCTIONS THAT WILL PREVENT ACCOMPLISHMENT OF THE WORK AS INDICATED <br />IPLETE SET OF PLANS WITH ALL REVISIONS, <br />ON THE DRAWINGS. <br />F. SEPARATE AND STOCK PILE ALL EXCAVATED MATERIALS SUITABLE FOR BACKFILL. ALL EXCESS EXCAVATED AND <br />LE FIRE EXTINGUISHERS WITH A RATING OF <br />UNSUITABLE MATERIALS SHALL BE DISPOSED OF OFF-SITE IN A LEGAL MANNER. <br />STANCE TO ALL PORTIONS OF WHERE THE <br />3.2 BACKFILL: <br />A. AS SOON AS PRACTICAL, AFTER COMPLETING CONSTRUCTION OF THE RELATED STRUCTURE, INCLUDING EXPIRATION OF <br />SHALL BE PROTECTED AT ALL TIMES, AND <br />THE SPECIFIED MINIMUM CURING PERIOD FOR CAST-IN-PLACE CONCRETE, BACKFILL THE EXCAVATION WITH APPROVED <br />LOCATED AS DIRECTED BY THE ARCHITECT <br />MATERIAL TO RESTORE THE REQUIRED FINISHED GRADE. <br />NHEN EXCAVATING OR DRILLING PIERS <br />1. PRIOR TO PLACING BACKFILL AROUND STRUCTURES, ALL FORMS SHALL BE REMOVED AND THE EXCAVATION <br />NING FOR THE WORKING CREW, THIS SHALL <br />CLEANED OF ALL TRASH, DEBRIS AND UNSUITABLE MATERIALS. <br />C) ELECTRICAL SAFETY, D) TRENCHING & <br />2. BACKFILL BY PLACING AND COMPACTING SUITABLE BACKFILL MATERIAL OR SELECT GRANULAR BACKFILL MATERIAL <br />WHEN REQUIRED IN UNIFORM HORIZONTAL LAYERS OF NO GREATER THAN 8-INCHES LOOSE THICKNESS AND <br />3, WHICH INTERFERE WITH THE EXECUTION <br />COMPACTED. WHERE HAND OPERATED COMPACTORS ARE USED, THE FILL MATERIAL SHALL BE PLACED IN LIFTS <br />DNNECTED AT POINTS WHICH WILL NOT <br />NOT TO EXCEED 4 INCHES IN LOOSE DEPTH AND COMPACTED. <br />INSOLE ARCHITECT / ENGINEER, AND <br />3. WHENEVER THE DENSITY TESTING INDICATES THAT THE CONTRACTOR HAS NOT OBTAINED THE SPECIFIED DENSITY, <br />THE SUCCEEDING LAYER SHALL NOT BE PLACED UNTIL THE SPECIFICATION REQUIREMENTS ARE MET UNLESS <br />COVERED BY THE TOWER, EQUIPMENT OF <br />OTHERWISE AUTHORIZED BY THE GEOTECHNICAL ENGINEER. THE CONTRACTOR SHALL TAKE WHATEVER <br />:VENT EROSION. <br />APPROPRIATE ACTION IS NECESSARY, SUCH AS DISKING AND DRYING, ADDING WATER, OR INCREASING THE <br />NO CONSTRUCTION, EROSION CONTROL <br />COMPACTIVE EFFORT TO MEET THE MINIMUM COMPACTION REQUIREMENTS. <br />DE WITH THE FEDERAL AND LOCAL <br />B. THOROUGHLY COMPACT EACH LAYER OF BACKFILL TO A MINIMUM OF 95% OF THE MAXIMUM DRY DENSITY AS PROVIDED BY <br />THE STANDARD PROCTOR TEST, ASTM D 698, <br />FROZEN MATERIALS, SNOW OR ICE SHALL <br />3.3 TRENCH EXCAVATION: <br />A. UTILITY TRENCHES SHALL BE EXCAVATED TO THE LINES AND GRADES SHOWN ON THE DRAWINGS OR AS DIRECTED BY THE <br />TO 95 PERCENT STANDARD PROCTOR <br />GENERAL CONTRACTOR. PROVIDE SHORING, SHEETING AND BRACING AS REQUIRED TO PREVENT CAVING OR SLOUGHING <br />ROCTOR DENSITY IN OPEN SPACE. ALL <br />OF THE TRENCH WALLS. <br />=ILL OR OTHER MATERIAL. PRE-APPROVED <br />B. EXTEND THE TRENCH WIDTH A MINIMUM OF 7 INCHES BEYOND THE OUTSIDE EDGE OF THE OUTERMOST CONDUIT. <br />C. WHEN SORE YIELDING, OR OTHERWISE UNSTABLE SOIL CONDITIONS ARE ENCOUNTERED, BACKFILL AT THE REQUIRED <br />=USE SHALL BE REMOVED FROM THE SITE <br />TRENCH TO A DEPTH OF NO LESS THAN 12 INCHES BELOW THE REQUIRED ELEVATION AND BACKFILL WITH GRANULAR <br />BEDDING MATERIAL. <br />P DRAWINGS, AND OTHER DOCUMENTS <br />3.4 TRENCH BACKFILL <br />CONSTRUCTION AND PRIOR TO PAYMENT. <br />A. PROVIDE GRANULAR BEDDING MATERIAL IN ACCORDANCE WITH THE DRAWING AND THE UTILITY REQUIREMENTS. <br />THE GENERAL CONTRACTOR UPON <br />B. NOTIFY THE GENERAL CONTRACTOR 24 HOURS IN ADVANCE OF BACKFILLING. <br />C. CONDUCT UTILITY CHECK TESTS BEFORE BACKFILLING. BACKFILL AND COMPACT TRENCH BEFORE ACCEPTANCE TESTING. <br />D. PLACE GRANULAR TRENCH BACKFILL UNIFORMLY ON BOTH SIDES OF THE CONDUITS IN 6-INCHES UNCOMPACTED LIFTS <br />3LE WATER OR SEWER SERVICE, AND IS <br />UNTIL 12 INCHES OVER THE CONDUITS. SOLIDLY RAM AND TAMP BACKFILL INTO SPACE AROUND CONDUITS. <br />E. PROTECT CONDUIT FROM LATERAL MOVEMENT, IMPACT DAMAGE OR UNBALANCED LOADING. <br />XWATELY 2 TIMES PER MONTH, BY AT&T <br />F. ABOVE THE CONDUIT EMBEDMENT ZONE, PLACE AND COMPACT SATISFACTORY BACKFILL MATERIAL IN 8-INCH MAXIMUM <br />LOOSE THICKNESS LIFTS TO RESTORE THE REQUIRED FINISHED SURFACE GRADE. <br />G. COMPACT FINAL TRENCH BACKFILL TO A DENSITY EQUAL TO OR GRATER THAT THAT OF THE EXISTING UNDISTURBED <br />CORDANCE WITH THE LATEST REVISION <br />MATERIAL IMMEDIATELY ADJACENT TO THE TRENCH BUT NO LESS THAT A MINIMUM OF 95% OF THE MAXIMUM DRY DENSITY AS <br />STRUCTION OF WIRELESS SITES" AND <br />PROVIDED BY THE STANDARD PROCTOR TEST, ASTM D 698. <br />CT BETWEEN THE CONSTRUCTION <br />3.5 AGGREGATE ACCESS ROAD: <br />A. CLEAR, GRUB, STRIP AND EXCAVATE FOR THE ACCESS ROAD TO THE LINES AND GRADES INDICATED ON THE DRAWINGS, SCARIFY <br />D INSPECTIONS REQUIRED FOR <br />TO A DEPTH OF 61NCHES AND PROOF-ROLL. ALL HOLES, RUTS, SOFT PLACES AND OTHER DEFECTS SHALL BE CORRECTED. <br />NOTIFY THE GENERAL CONTRACTOR <br />B. THE ENTIRE SUBGRADE SHALL BE COMPACTED TO NOT LESS THAN 95 PERCENT OF THE MAXIMUM DRY DENSITY AS PROVIDED BY <br />THE STANDARD PROCTOR TEST, ASTM D 1557. <br />C. AFTER PREPARATION OF THE SUBGRADE IS COMPLETE THE GEOTEXTILE FABRIC (MIRAFI 500XM) SHALL BE INSTALLED TO THE LIMITS <br />1 A DAILY BASIS. <br />INDICATED ON THE DRAWINGS BY ROLLING THE FABRIC OUT LONGITUDINALLY ALONG THE ROADWAY THE FABRIC SHALL NOT BE <br />3 AND/OR DRAWINGS PROVIDED BY THE <br />DRAGGED ACROSS THE SUBGRADE. PLACE THE ENTIRE ROLL IN A SINGLE OPERATION, ROLLING OUT AS SMOOTHLY AS POSSIBLE. <br />(NCIES PRIOR TO ORDERING MATERIAL OF <br />1. OVERLAPS PARALLEL TO THE ROADWAY WILL BE PERMITTED AT THE CENTERLINE AND AT LOCATIONS BEYOND THE <br />ROADWAY SURFACE WIDTH (I.E. WITHIN THE SHOULDER WIDTH) ONLY, NO LONGITUDINAL OVERLAPS SHALL BE LOCATED <br />ET FAA STANDARDS AND REQUIREMENTS. <br />BETWEEN THE CENTERLINE AND THE SHOULDER. PARALLEL OVERLAPS SHALL BE A MINIMUM OF 3 FEET WIDE. <br />"IONS AND RECOMMENDATIONS. <br />2. TRANSVERSE (PERPENDICULAR TO THE ROADWAY) OVERLAPS AT THE END OF A ROLL. SHALL OVERLAP IN THE DIRECTION OF <br />ISREGARD THIS NOTE IF THIS SITE HAS A <br />THE AGGREGATE PLACEMENT (PREVIOUS ROLL ON TOP) AND SHALL HAVE A MINIMUM LENGTH OF 3 FEET, <br />3. ALL OVERLAPS SHALL BE PINNED WITH STAPLES OF NAILS A MINIMUM OF 10 INCHES. LONG TO INSURE POSITIONING DURING <br />TO REMAIN, UNLESS NOTED OTHERWISE. <br />PLACEMENT OF AGGREGATE. PIN LONGITUDINAL SEAMS AT 25 FOOT CENTERS AND TRANSVERSE SEAMS EVERY 5 FEET, <br />D. THE AGGREGATE BASE AND SURFACE COURSES SHALL BE CONSTRUCTED IN LAYERS NOT MORE THAN 4 INCH (COMPACTED) <br />THICKNESS, AGGREGATE TO BE PLACED ON GEOTEXTILE FABRIC SHALL BE END - DUMPED ON THE FABRIC FROM THE FREE END OF <br />THE FABRIC OR OVER PREVIOUSLY PLACED AGGREGATE. THE FIRST LIFT SHALL BE BLADED DOWN TO A THICKNESS OF 8 INCHES <br />PRIOR TO COMPACTION. AT NO TIME SHALL EQUIPMENT, EITHER TRANSPORTING THE AGGREGATE OR GRADING THE AGGREGATE, <br />\DE <br />BE PERMITTED ON THE ROADWAY WITH LESS THAT 41NCHES OF MATERIAL COVERING THE FABRIC. <br />WORK <br />E. THE AGGREGATE SHALL BE IMMEDIATELY COMPACTED TO NOT LESS THAN 95 PERCENT OF THE MAXIMUM DRY DENSITY AS <br />PROVIDED BY THE PROCTOR TEST, ASTM D 1557 WITH A TAMPING ROLLER, OR WITH A PNEUMATIC - TIRED ROLLER, OR WITH A <br />VIBRATORY MACHINE OR ANY COMBINATION OF THE ABOVE. THE TOP LAYER SHALL BE GIVEN A FINAL ROLLING WITH A <br />THREE-WHELL OR TANDEM ROLLER. <br />16 FINISH GRADING: <br />4S FOR HIGHWAY CONSTRUCTION - CURRENT <br />A. PERFORM ALL GRADING TO PROVIDE POSITIVE DRAINAGE AWAY FROM STRUCTURES AND SMOOTH, EVEN SURFACE DRAINAGE OF <br />THE ENTIRE AREA WITHIN THE LIMITS OF CONSTRUCTION, GRADING SHALL BE COMPATIBLE WITH ALL SURROUNDING TOPOGRAPHY <br />AND STRUCTURES. <br />B. UTILIZE SATISFACTORY FILL MATERIAL, RESULTING FROM THE EXCAVATION WORK IN THE CONSTRUCTION OF FILLS, EMBANKMENTS <br />AND FOR REPLACEMENTS OF REMOVED UNSUITABLE MATERIALS. <br />SHALL BE PERFORMED BY SUBCONTRACTORS <br />C. ACHIEVE FINISHED GRADE BY PLACING A MINIMUM OF 4 INCHES OF 112" - 3/4" CRUSHED STONE ON TOP SOIL STABILIZER FABRIC. <br />1BCONTRACTOR. <br />D. REPAIR ALL ACCESS ROADS AND SURROUND AREAS USED DURING THE COURSE OF THIS WORK TO THEIR ORIGINAL CONDITION, <br />,CTOR WHO SHALL CARRY OUT THE GENERAL <br />3.7 ASPHALT PAVING ROAD: <br />AANCE OF THE WORK AS SPECIFIED AND / OR <br />A. DIVISION 600- KDOT FLEXIBLE PAVEMENT (UPDATE PER LOCAL DOT) <br /> <br />5. NE PA (NATIONAL FIRE PROTECTION ASSOCIATION) <br />6. OSHA (OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION) <br />7. UL (UNDERWRITERS LABORATORIES, INC.) <br />8. AT&T MOBILITY GROUNDING STANDARD ND-00071 <br />SCOPE OF WORK: <br />A. WORK UNDER THIS SECTION SHALL CONSIST OF FURNISHING ALL LABOR, MATERIAL, AND ASSOCIATED SERVIC <br />REQUIRED TO COMPLETE REQUIRED CONSTRUCTION AND BE OPERATIONAL. <br />B. ALL ELECTRICAL EQUIPMENT UNDER THIS CONTRACT SHALL BE PROPERLY TESTED, ADJUSTED, AND ALIGNED <br />SUBCONTRACTOR. <br />C. THE SUBCONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXCAVATING, DRAINING, TRENCHING, BACKFILLING, A <br />OR EXCESS DIRT. <br />D. THE SUBCONTRACTOR SHALL FURNISH TO THE OWNER WITH CERTIFICATES OF A FINAL INSPECTION AND APPF <br />THE INSPECTION AUTHORITIES HAVING JURISDICTION. <br />E. THE SUBCONTRACTOR SHALL PREPARE A COMPLETE SET OF AS-BUILT DRAWINGS, DOCUMENT ALL WIRING EQ <br />CONDITIONS, AND CHANGES WHILE COMPLETING THIS CONTRACT. THE AS-BUILT DRAWINGS SHALL BE SUBMIT <br />COMPLETION OF THE PROJECT. <br />PART 2-PRODUCTS <br />2.1 GENERAL <br />A. ALL MATERIALS AND EQUIPMENT SHALL BE UL LISTED, PROPOSED AND FREE FROM DEFECTS. <br />B. ALL ITEMS OF MATERIALS AND EQUIPMENT SHALL BE ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION <br />FOR THE USE INTENDED. <br />C. ALL EQUIPMENT SHALL BEAR THE UNDERWRITERS LABORATORIES LABEL OR APPROVAL, AND SHALL CONFORI <br />REQUIREMENT OF THE NATIONAL ELECTRICAL CODE. <br />D. ALL OVER CURRENT DEVICES HAVE AN INTERRUPTING CURRENT RATING EQUAL TO OR GREATER THAN THE SI <br />CIRCUIT CURRENT TO WHICH THEY ARE SUBJECTED, 10,000 AIC MINIMUM. VERIFY AVAILABLE SHORT CIRCUIT C <br />DOES NOT EXCEED THE RATING OF ELECTRICAL EQUIPMENT, <br />2.2 MATERIALS AND EQUIPMENT: <br />A. CONDUIT: <br />1. RIGID METAL CONDUIT (RMC) SHALL BE HOT- DIPPED GALVANIZED INSIDE AND OUTSIDE INCLUDING ENE <br />THREADS AND ENAMELED OR LACQUERED IN ADDITION TO GALVANIZING. <br />2. LIQUID TIGHT FLEXIBLE METAL CONDUIT SHALL BE UL LISTED. <br />3, CONDUIT CLAMPS, STRAPS AND SUPPORTS SHALL BE STEEL OR MALLEABLE IRON. ALL FITTINGS SHALL <br />COMPRESSION AND CONCRETE TIGHT TYPE. GROUNDING BUSHINGS WITH INSULATED THROATS SHALL <br />INSTALLED ON ALL CONDUIT TERMINATIONS. <br />4. NON-METALLIC CONDUIT AND FITTINGS SHALL BE SCHEDULE 40 PVC. INSTALL USING SOLVENT - CEMEN" <br />JOINTS AS RECOMMENDED BY THE MANUFACTURER, <br />B. CONDUCTORS AND CABLE: <br />1. CONDUCTORS AND CABLE SHALL BE FLAME - RETARDANT, MOISTURE AND HEAT RESISTANT THERMOPL <br />SINGLE CONDUCTOR, COPPER, TYPE THHN/THWN-2, 600 VOLT, SIZE AS INDICATED, 12 AWG SHALL BE TH <br />SIZE CONDUCTOR USED. <br />2. 10 AWG AND SMALLER CONDUCTOR SHALL BE SOLID OR STRANDED AND 8 AWG AND LARGER CONDUCT <br />STRANDED. <br />3. SOLDERLESS, COMPRESSION - TYPE CONNECTORS SHALL BE USED FOR TERMINATION OF ALL STRAND[ <br />CONDUCTORS. <br />4. STRAIN-RELIEF SUPPORTS GRIPS SHALL BE HUBBELL KELLEMS OR APPROVED EQUAL. CABLES SHALL B <br />SUPPORTED IN ACCORDANCE WITH THE NEC AND CABLE MANUFACTURER'S RECOMMENDATIONS. <br />5. ALL CONDUCTORS SHALL BE TAGGED AT BOTH ENDS OF THE CONDUCTOR, AT ALL PULL BOXES, J-BOXE <br />EQUIPMENT AND CABINETS AND SHALL BE IDENTIFIED WITH APPROVED PLASTIC TAGS (ACTION CRAFT, I <br />APPROVED EQUAL). <br />C. DISCONNECT SWITCHES: <br />1. DISCONNECT SWITCHES SHALL BE HEAVY DUTY, DEAD - FRONT, QUICK - MAKE, QUICK - BREAK, EXTERN. <br />OPERABLE, HANDLE LOCKABLE AND INTERLOCK WITH COVER IN CLOSED POSITION, RATING AS INDICATI <br />LABELED FURNISHED IN NEMA 3R ENCLOSURE, SQUARE - D OR APPROVED EQUAL. <br />D. CHEMICAL ELECTROLYTIC GROUNDING SYSTEM: <br />1. INSTALL CHEMICAL GROUNDING AS REQUIRED. THE SYSTEM SHALL BE ELECTROLYTIC MAINTENANCE F[ <br />ELECTRODE CONSISTING OF RODS WITH A MINIMUM OF 2 AWG CU EXOTHERMALLY WELDED PIGTAIL, PR <br />BOXES, AND BACKFILL MATERIAL. MANUFACTURER SHALL BE LYNCOLE AT GROUNDING ROD TYPES K2 <br />K21_-(')CS LENGTH AS REQUIRED. <br />2. GROUND ACCESS BOX SHALL BE A POLY-PLASTIC BOX FOR NON-TRAFFIC APPLICATIONS, INCLUDING BC <br />FLUSH COVER WITH "BREATHER" HOLES, XIT MODEL #XB-22. ALL DISCONNECT SWITCHES AND CONTROL <br />DEVICES SHALL BE PROVIDED WITH ENGRAVED LAMICOID NAMEPLATES INDICATING EQUIPMENT CONTR <br />BRANCH CIRCUITS ID NUMBERING, AND THE ELECTRICAL POWER SOURCE. <br />3. BACKFILL MATERIAL SHALL BE LYNCONITE AND LYNCOLE GROUNDING GRAVEL. <br />E. SYSTEM GROUNDING: <br />1. ALL GROUNDING COMPONENTS SHALL BE TINNED AND GROUNDING CONDUCTOR SHALL BE 2 AWG BAR[ <br />COPPER. ABOVE GRADE GROUNDING CONDUCTORS SHALL BE INSULATED WHERE NOTED. <br />2. GROUNDING BUSES SHALL BE BARE, TINNED, ANNEALED COPPER BARS OF RECTANGULAR CROSS SEC" <br />BARS MISS, SHALL BE FURNISHED AND INSTALLED BY THE SUBCONTRACTOR. THEY SHALL NOT BE FABR <br />IN THE FIELD. ALL GROUNDING BUSES SHALL BE IDENTIFIED WITH MINIMUM 3/4" LETTERS BY WAY OF ST <br />DESIGNATION PLATE. <br />3. CONNECTORS SHALL BE HIGH - CONDUCTIVITY, HEAVY DUTY, LISTED AND LABELED AS GROUNDED CON <br />MATERIALS USED. USE TWO - HOLD COMPRESSION LUGS WITH HEAT SHRINK FOR MECHANICAL CONNE( <br />4. EXOTHERMIC WELDED CONNECTIONS SHALL BE PROVIDED IN KIT FORM AND SELECTED FOR THE SPECI <br />AND COMBINATIONS OF CONDUCTORS AND OTHER ITEMS TO BE CONNECTED. <br />5. GROUND RODS SHALL BE COPPER - CLAD STEEL WITH HIGH - STRENGTH STEEL CORE AND ELECTROLY <br />OUTER SHEATH, MOLTEN WELDED TO CORE, 5/8" X 10'-0". ALL GROUNDING RODS SHALL BE INSTALLED V <br />SLEEVES. <br />6. INSTALL AN EQUIPMENT GROUNDING CONDUCTOR IN ALL CONDUITS IN COMPLIANCE WITH THE SPECIFI- <br />THE EQUIPMENT GROUNDING CONDUCTORS SHALL BE BONDED AT ALL JUNCTION BOXES, DISCONNECT <br />STARTERS, AND EQUIPMENT CABINETS. <br />F. OTHER MATERIALS: <br />1. THE SUBCONTRACTOR SHALL PROVIDE OTHER MATERIALS, THOUGH NOT SPECIFICALLY DESCRIBED, W <br />FOR A COMPLETELY OPERATIONAL SYSTEM AND PROPER INSTALLATION OF THE WORK. <br />2. PROVIDE PULL BOXES AND JUNCTION BOXES WHERE SHOWN OR REQUIRED BY NEC. <br />G. PANELS AND LOAD CENTERS: <br />1. ALL PANEL DIRECTORIES SHALL BE TYPEWRITTEN. <br />PART 3-EXECUTION <br />3.1 GENERAL <br />A. ALL MATERIAL AND EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RI <br />B. EQUIPMENT SHALL BE TIGHTLY COVERED AND PROTECTED AGAINST DIRT OR WATER, AND AGAINST CHEMICAI <br />INJURY DURING INSTALLATION AND CONSTRUCTION PERIODS, <br />3.2 LABOR AND WORKMANSHIP: <br />A. ALL LABOR FOR THE INSTALLATION OF MATERIALS AND EQUIPMENT FURNISHED FOR THE ELECTRICAL SYSTEA <br />INSTALLED BY EXPERIENCED WIRE MEN, IN A NEAT AND WORKMANLIKE MANNER. <br />B. ALL ELECTRICAL EQUIPMENT SHALL BE ADJUSTED, ALIGNED AND TESTED BY THE SUBCONTRACTOR As RECUT <br />THE INTENDED PERFORMANCE. <br />C. UPON COMPLETION OF WORK, THE SUBCONTRACTOR SHALL THOROUGHLY CLEAN ALL EXPOSED EQUIPMENT, <br />AND ANY DEBRIS, CRATING, OR CARTONS AND LEAVE THE INSTALLATION FINISHED AND READY FOR OPERATIC <br />3.3 COORDINATION: <br />A. THE SUBCONTRACTOR SHALL COORDINATE THE INSTALLATION OF ELECTRICAL ITEMS WITH THE OWNER- FUF <br />DELIVERY SCHEDULE TO PREVENT UNNECESSARY DELAYS IN THE TOTAL WORK. <br />3.4 INSTALLATION: <br />A. CONDUIT: <br />1. ALL ELECTRICAL WIRING SHALL BE INSTALLED IN CONDUIT AS SPECIFIED. NO CONDUIT OR TUBING OF L <br />TRADE SIZE. <br />2. PROVIDE RIGID PVC SCHEDULE 80 CONDUITS FOR ALL RISERS, RMC OTHERWISE NOTED. EMT MAY BE IN <br />EXTERIOR CONDUITS WHERE NOT SUBJECT TO PHYSICAL DAMAGE. <br />3. THE INSTALLATION OF SCHEDULE 40 PVC AND RMC CONDUITS SHALL BE 24 INCHES MINIMUM DEPTH. AL <br />SHALL BE RMC. EXPANSION JOINTS ARE REQUIRED ON ALL CONDUIT RISERS. <br />4. USE GALVANIZED FLEXIBLE STEEL CONDUIT WHERE DIRECT CONNECTION TO EQUIPMENT WITH MOVEM <br />