My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Comments: Hearing Ex. 1 - ATT Additional Testimony (5/27/15)
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
Public Comments: Hearing Ex. 1 - ATT Additional Testimony (5/27/15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 4:05:57 PM
Creation date
5/28/2015 9:45:53 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
ATT AT CROSSFIRE
Document Type
Misc.
Document_Date
5/27/2015
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Techn®l%y w-mocietes <br />RESPONSE: To meet the "as attractive as the nature of the use and its location and <br />setting warrant" requirement, the Applicant has re-designed the antenna array to provide <br />more stealthing of the facilities. The new configuration, as show on site plans and in <br />photo simulations, reduces the number of antennas from a total of 12 to 6 (2 antennas <br />per sector) with a shorter 3' antenna frame and a shorter stand off from the pole, so the <br />proposed antennas will more closely "hug" the pole, further concealing it within the <br />branches. In addition, the Applicant is proposes landscaping around the base of the pole <br />as well as the building extension that will house the ancillary equipment to promote as <br />attractive an environment as possible that blends in with the existing buildings, flora and <br />mature trees on the subject property as well as the surrounding neighborhood. <br />7. 9.5750 Telecommunication Devices-Siting Requirements and Procedures. <br />(6) Application Requirements. <br />(a) Construction of Transmission Tower. In addition to standard <br />required application material, an applicant for a transmission <br />tower shall submit the following information; additional <br />application material is required, as specified in paragraph (c) <br />below, for applications requiringa site review orconditional <br />use process: <br />1. A description of the proposed tower location, design and <br />height. <br />The photo simulations are inconsistent with the plans regarding the tower design and <br />the landscaping. <br />RESPONSE: The proposed monopine is a total of 75' tall, the pole itself and antenna tip <br />height is 70' and then we have added an additional 5' of branches to the top to resemble <br />the tapering of a natural pine tree. The antenna configuration has been revised from the <br />initial application and Applicant has reduced the number of panel antennas from 12 to 6 <br />to bring them closer into the pole and provide greater concealment. New photo <br />7117 SW Beveland Street, Suite 101 <br />Tigard, OR 97223 <br />(323) 559-4103 <br />Email: jacob.tinney@_faer.net <br />www,taec.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.