My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Comments: Hearing Ex. 1 - ATT Additional Testimony (5/27/15)
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
Public Comments: Hearing Ex. 1 - ATT Additional Testimony (5/27/15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 4:05:57 PM
Creation date
5/28/2015 9:45:53 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
ATT AT CROSSFIRE
Document Type
Misc.
Document_Date
5/27/2015
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />9.5750 Telecommunication Devices-Siting Requirements and Procedures. <br />(6) Application Requirements. <br />(b) Construction of Transmission Tower. In addition to standard required <br />application material, an applicant for a transmission tower shall submit <br />the following information; additional application material is required, as <br />specified in paragraph (c) below, for applications requiring a site review <br />or conditional use process: <br />1. . A description of the proposed tower location, design and height. <br />The photo simulations are inconsistent with the plans regarding the tower design and the <br />landscaping. <br />5. Documentation that the ancillary facilities will not produce sound <br />levels in excess of those standards specified in subsection (7) of this <br />section, or designs showing how the sound is to be effectively <br />muffled and reduced pursuant to those standards. <br />The supplemental noise report has notes that make it difficult to read. Please clarify the generator <br />noise level, as the written statement seems to rely on our citywide noise standards. <br />What would be the noise generation if all facilities were underground? It would be helpful to show <br />a comparison, to justify a variance to undergrounding. <br />10. Signature of the property owner(s) on the application form or a <br />statement from the property owner(s) granting authorization to <br />proceed with development permit and land use processes; <br />Please verify that the person who signed the application form is the property owner or has the <br />authority to sign on behalf of the property owner. <br />(c) Site Review and Conditional Use Permit Applications. In addition to the <br />application requirements specified in paragraph (b) above, applications <br />for site review or conditional use permits also shall include the following <br />information: <br />1. A visual study containing, at a minimum, a graphic simulation <br />showing the appearance of the proposed tower, antennas, and <br />ancillary facilities from at least 5 points within a 3 mile radius. Such <br />points shall be chosen by the provider with review and approval by <br />the planning director to ensure that various potential views are <br />represented. <br />Application Deficiencies: New Cingular Wireless Crossfire Church (CU 14-3) Page 3 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.