My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Comments: Hearing Ex. 2 - Friends of Amazon Creek Submittal
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
Public Comments: Hearing Ex. 2 - Friends of Amazon Creek Submittal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2015 9:28:58 AM
Creation date
5/28/2015 9:26:29 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
ATT AT CROSSFIRE
Document Type
Public Comments
Document_Date
5/27/2015
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ex. C <br />Attachment D <br />Telecommunication Facilities: Comparison of key code provisions in residential zones <br />Residential StandardCity of Eugene City of Beaverton <br />New Towers: Prohibited zonesR-2, R-3, R-4, AG, Historic (H), None. Allowed in all zones <br />Natural Resource(NR), Park, <br />Recreation and Open Space Zone <br />(PRO); also prohibited in <br />Willamette Greenway, Gillespie <br />Butte and ridgeline <br />New Towers: Land Use ProcessAll zones: Type III public hearing <br />R-1: Type III public hearing <br />process (Conditional Use Permit) <br />process (Conditional Use <br />Permit) <br />R-2, R-3, R-4: Prohibited <br />Independent review3 rd party technical review of No independent review required <br />applicant’s materials required <br />Separation between towers New towers must be 2000 feet No specific requirement. <br />or greater from existing towers <br />Co-location Tower must be able to Tower must be able to <br />accommodate 2 providers accommodate 2 providers <br />Height Limits: New Towers R-1: 75 feet All residential zones: 80 feet <br />Minimum Setbacks: New Towers Equal to height of the tower Equal to height of the tower + 5 <br />feet <br />Mechanical EquipmentMust be undergroundAllowed above ground, in <br />enclosed structure <br />Noise ImpactsMaximum of 45 decibels allowed Baffling or sound barriers <br />at the property line required but no noise limits <br />specified <br />Landscape screening 6 ft. high, dense evergreen City may require landscape <br />screening required around tower screening; 10 foot high <br />evergreen, every 30 feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.