Equipment Cabinets: Cabinets cannot exceed elevation view standards within the ROW and <br />must meet maximum size, clearance setbacks and number maximums as defined by <br />administrative order (See R-7.302-D). Equipment located on private property is subject to zoning <br />requirements. Exceptions reviewed on a case by case basis. The City may require the applicant <br />to pay for a third party review by an acoustical expert to confirm compliance. <br /> <br />Category 3: Includes the following zoning districts: I-1, I-2, I-3 <br /> <br /> Height Limit: None. <br /> <br /> Equipment Cabinets: Reviewed on a case by case basis for inclusion in the ROW. <br /> <br />LOCATION <br />In order to minimize impact to nearby residences, the following locational factors shall be <br />considered: <br />If the proposed facility is a Category 2 site and located within 50’ of a residential zone (R-1, R-2, <br />R-3, R-4), then the Category 1 height limits shall apply. <br />Preference shall be given to poles or structures that are not in close proximity to residences. For <br />example, poles immediately adjacent to a front yard and within full view of a single family <br />residence shall be discouraged. <br />ROW’s along arterial and collector streets shall generally be encouraged over smaller local <br />streets. <br />Poles or structure locations that are partially (or fully) screened by other structures or <br />landscaping shall be given priority. <br /> <br />REVIEW PROCESS <br />Requests for telecom facilities in the ROW shall be forwarded to the following agencies (at a <br />minimum) for review and comment: <br />EWEB – Jaime Breckenridge, Utility Joint Use Coordinator <br />Phone: (541) 685-7388 Email: Jaime.Breckenridge@eweb.org <br />City of Eugene Public Works – Brian Siria, Utility Coordinator/Inspector <br />Phone: (541) 682-4887 Email: Brian.t.siria@ci.eugene.or.us <br />City of Eugene Planning – Gabe Flock, Senior Planner <br />Phone: (541) 682-5697 Email: Gabriel.flock@ci.eugene.or.us <br />City of Eugene – Pam Berrian, Telecommunications and Cable Program Manager <br />Phone: (541) 682-5590 Email: Pam.c.berrian@ci.eugene.or.us <br /> <br />Key steps and responsibilities include the following: <br />1. The ROW pole (or other utility) owner should be the first to review the request for general <br />feasibility. <br />