conductors support by the pole (if any) prior to communication work commencing. All work shall be <br />ĐŽŽƌĚŝŶĂƚĞĚƚŚƌŽƵŐŚt͛Ɛ:ŽŝŶt Use Coordinator and Electric Operations. EWEB will require a <br />minimum 30 day prior notice for Electric Operations work planning and scheduling. Communication <br />applicant is responsible for customer outage notification and coordination. <br />10.2 Applicant shall install and maintain a load-break, UL-listed disconnect switch located on the <br />communication pedestal to de-energize both the normal (utility) and backup power to the <br />communication antenna(s). Disconnect switch shall be capable of being locked in either the open or <br />closed position with standard EWEB double hasp. Applicant shall provide a lock on one side of the <br />hasp and EWEB will install an EWEB lock on the other side of the hasp which will allow either the <br />applicant or EWEB to remove one lock, remove the double hasp and open the disconnect switch. <br />The disconnect switch blades, jaws and the air-gap between them shall all be clearly visible when <br />the switch is in the open position. <br /> <br />10.3 EWEB will install and maintain the following: <br /> 10.3a Pole and pole framing, <br /> 10.3b Pole ground and bonding jumper from pole ground to antenna equipment ground. <br /> 10.3c Upper portion of electric service pole dip, <br /> 10.3d Disconnect switches on primary circuit required to de-energize the primary conductors <br />supported from the antenna pole. <br />DISTRIBUTIONCUSTOMER RESPONSIBILITIESSTANDARD <br />EUGENEWATER&ELECTRICBOARD-EUGENE,OREGON <br />Approved Jun17, 2014 <br />COMMUNICATION ANTENNA INSTALLATION GUIDELINES <br />REV <br />EC4-A.8000 <br />0 <br />Page5of5 <br /> <br />